Editor’s Note— DESIGN AND TECHNICAL
REQUIREMENTS FOR INFRASTRUCTURE FROM
THIRD PARTY PROVIDERS ARE TO BE IN ADDITION
TO, AND INTEGRATED WHERE POSSIBLE, INTO
THE OVERALL DESIGN, BUILT FORM AND
LANDSCAPING REQUIREMENTS FOR THE
DEVELOPMENT.
Road technical standards The Development will
PO2 No acceptable outcome provided. Comply
Road widths and construction within
the development are adequate for
QFES vehicles to gain access to a
safe working area close to buildings
and near water supplies whether or not
on-street parking spaces are occupied.
Editor’s Note—ROADS SHOULD BE
DESIGNED AND CONSTRUCTED
IN ACCORDANCE WITH Road
Planning and Design manual- 2nd
edition.
Table 9.4.8.3
Stormwater Drainage Design
PO1 A stormwater
The development and its AO1 management plan has
stormwater management system is A stormwater management plan is prepared consistent been prepared
planned and designed having with PSP6 Engineering Design Standards - Roads,
regard to: drainage and earthworks.
1. the natural features of
the site;
2. the need to avoid
impacts and potential
risks to ecologically
important areas;
3. the likely effectiveness
of erosion and sediment
control and stormwater
drainage measures
during rainfall events
during and post
construction; and
the need to protect environmental
values and water quality of receiving
waters both during and post
construction.
PO2 AO2.1 The Development will
Stormwater drainage infrastructure is Stormwater drainage planning, design and construction is in Comply
planned, designed and constructed to: accordance with PSP6 Engineering Design Standards -
Roads, drainage and earthworks and the latest version of the
1. incorporate allowance Queensland Urban Drainage Design Manual.
for increased flood risk
and tidal inundation AO2.2
through pipework as a The stormwater drainage system connects to a lawful point of
result of cilmate change discharge in accordance with PSP6 Engineering Design
and sea level rise; Standards - Roads, drainage and earthworks.
2. ensure the development
is adequately drained; AO2.3
and Stormwater flows discharging from the development are
ensure stormwater is managed and demonstrated to be consistent with pre-development
lawfully discharged without altering characteristics.
stormwater drainage characteristics
external to the site. AO2.4
Development provides for the management of stormwater to
NMA_ECAR_19323
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.