Delegated Report - Code - Planning MCU26 0040, OPW26 0066 & RAL26 0013 (As Published)
The applicant has not proposed any dedicated bicycle parking spaces on common property, with
all bicycle parking instead being allocated within individual tenancies. A condition will be imposed
requiring the provision of 10 bicycle parking spaces on common property.
It is considered reasonable for the remaining 24 required bicycle parking spaces to be
accommodated within the respective tenancies. Furthermore, end-of-trip facilities, including
shower facilities and lockers, are to be provided on site. As such, the proposed arrangement is
considered appropriate as it will support and encourage cycling as a mode of transport for
employees and visitors, upholding the Performance Outcome objective.
Reconfiguring a Lot – Staging of Community Title Scheme
In accordance with the Planning Act 2016, any proposal to stage the titling arrangements of the
development such that a Building Format Plan is registered with a balance lot for future
development will first require a Development Permit for Reconfiguring a Lot.
The applicant proposes to stage the development and accordingly stage the community title
scheme (CTS), and accordingly has triggered reconfiguring a lot development application.
All stages are as illustrated by Plan 04 (I) prepared by Building Suncoast Green.
The proposed staging plan has been reviewed by Council’s Senior Development Engineer, and all
relevant services and infrastructure are proposed to be provided per stage.
5. CONSULTATION
5.1. Referral Agencies
The application was referred to the following Advice Agency:
• Energex Energy
The Advice Agency triggered referral for
• Schedule 10, Part 9, Division 2, Table 1, Item 1 (10.9.2.1.1) – Reconfiguring a lot subject to
an easement for the benefit of a distribution entity under the Electricity Act for a supply
network; or part of the lot is within 100m of a substation site
• Schedule 10, Part 9, Division 2, Table 2, Item 1 (10.9.2.2.1) – Material Change of use of
premises within 100m of a substation site or subject to an easement for the benefit of a
distribution entity under the Electricity Act and the easement is for a supply network
• Schedule 10, Part 9, Division 2, Table 3, Item 1 (10.9.2.3.1) - Operational Work on premises
subject to an easement for the benefit of a distribution entity under the Electricity Act for a
supply network; or part of the lot is within 10m of a substation site
The Advice Agency has responded advising that the development is approved subject to
conditions.
5.2. Internal Council Referrals
The application was forwarded to the following internal Council officers for review and/or comment:
• Senior Development Engineer, Development Assessment – as conditioned.
The pertinent issues are discussed below.
Access
A heavy-duty vehicle crossover is proposed to service the development in accordance with
Council’s standard drawing RS-051. A 300mm wide heavy duty strip drain is proposed to
capture surface flows from within the development and discharge them into Taylors Court
via kerb adapter.
Parking & Manoeuvring Areas
The site is provided with 125 carparking spaces that are generally compliant with AS2890.
Page 10 of 33
Document Set ID: 25021329
Version: 9, Version Date: 12/08/2026