07/0387 - Op Works - Landscaping, Carparking & Access, Frontage [As Published] · 142007.387

of 62

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

DRAWING SIZE ~ A2

  

4
[AH

Natural Ground (
Ni2 @ 400

Horizontal &
Vertical

ctf
Vea end

   
   
  
  

ena

Zan

 

‘les

 

 

= Py 400 Cog
a
H < 1500 ~ Ni2-400
a H < 2000 ~ NI6~400
a CS 3L12TM top & botio
“if R6 figs 450 ctrs
N12 Full _
length 350 M12" 400
— Bose Widti
~ |
LEGEND
RW-03 Type 3 Retaining wall, refer detods
CW Gorden Wall Footing, refer 16115-St for details
— — WT — — indicates position of approved silt retension
fence.
FALL indicates direction of fall to surface levels,
(Ht) Indicates 3000(Lt) under ground holding tonks.

FILLING NOTES:

~The site is to be scroped cleor of all organic material and debris.

~ Any fill is to be clean gronulor material (ie. sand to a clayey sand
in accordance with AS1726) be tree of any organic material and hove
a clay content of less than 12% (Plasticity Index less than 25%, Linear
shrinkage of 15%). The proposed moteriol is to be inspected by SCG
Consulting Engineers prior to its removal to ensure its compatability.
— The fil is to be ptoced and compacted in accordance with
AS3798-1996 to a level sufficient to achieve o Level 1 certification
with a minimum retotive field density of 95%. Copies of compaction
test results shall be presented to SCG Consutling Engineers for
‘approval.

~ Filling and compacting adjacent exisiting structures is to be in
strict accordonce with the ossociated details ond specifcotions.

~ Areas where existing structures or trees are removed shali be
dockfilled with the approved fil material compacted in occordance with
AS2B70-1996 to achieve a minimum relative field density of 95%.

~ Any loose or soft materiat uncovered in the site preparation sholl
be removed and replaced with the approved fil material compacted in
accordance with AS2B70-1996 to achieve a minimum relative field
density of 95%

— Site drainoge and sit protection measures must be installed prior
to construction commencing.

WHERE NO RETAINING THE GARDEN

WALL {S TO BE GROUT FILLED MTH
Ni2~1200 CIRS VERT & HORIZ.

 

 

Longitudinal bors

 

 

Revision [Descripfon SsSC~sisz”
. Storm Water & Holding tanks added.
es

14/06/2008 14:39 AM

11.40.06.

 

Mait 1611$-OWl.dag

PROIR 70 CONSTRUCTION ENGINEERS

INDICATES SHEET PILING, DESIGN ANO
INSTALLATION BY OTHERS. BUILDER 70 CONFIRM
EXTENT REQUIRED 10 SATISFY CRITICAL DEPTH
LINE, PROTECTION OF NEIGHBOURING STRUCTRES.
(WINIMUM VIBRATION TECHNIQUES TO BE USED.
PRE~AUGERING OR BETTER) 70 BE WITHIN
PROPERTY BOUNDARY.

(N TO CONFIRM THE
CONTAINED HERE IN.

 
   
  
 
 

BUILDER TO MAINTAIN STABLITY
‘OF ALL NEIGHBOURING STRUCTURES,

 

DRIVEWAY CROSS OVER DETALS
TO BE tN ACCORDANCE WITH
NOOSA SHIRE COUNCIL'S STD 5 1
DRAWAGS 9005 & 9019, spot

CSW ==

9 ° ° vs

 
 

APPROVED N.S.C

KERB ADAPTOR oN,

EXISTING KERB AND CHANNELL
TO BE CUT AND REMOVED

AND NEW DRIVE WAY TO BE
WSTALLED TO N.S.C STANDARDS.

   
  
  

  

     

  

IS TO REVIEW CONTOUR SERVERY

(TO BE PROVIDED) ON BOTH ALOMENTS

 

5

1. Existing footpaths to be saw cut prior to removal

2. Crossings are not designed for commercial vehicles
3, Concrete driveway to be 125mm thk. excluding any
finished treatments, eg. stamping

4. Concrete surface tolerance +5.0mm over 3.0m

5. Concrete N25 in accordance with AS 1379 and AS
3600

DETAILS

6. Reinforcement fobric to AS 1304, placed central slab
depth.

7. Expansion joints to be 10mm wide wet tooled with
every 2nd mesh wire cut along joint.

8. One access point permitted for each allotment.

9. For curved driveways, maximum grades apply to inside
edge of curve

10. All services to be located and protected as required
Prior to work commencing

THE CONTRACTOR IS T0 INSTALL APPROVED SLT RETENTION FENCES

  
 
 
 
 
 
 
  
 
    
  

  

a? PRIOR TO COMMENCING ANY EARTHMIORKS. THE FENCE 15 10 BE
20-AGnm AGERECATE as i * 900() GEO-FABRIC SILT CONSTRUCTED ALONG THE LOWEST BOUNDARY AND RETURNED UP SIDE
HARD STAND Y s FALL DRIVEWAY Existing timber FENCE, FIXED TO SPIKES AND POURS 1 jo StF FUL STORUIATER EMTRAPWENT SRFACE

4 ; tin — ALLOTMENT WAIST ORAL TONARDS
consmucTon LOTT, ff gh fp aap relcining wal ee INTO STABLE AND SHALL NOT ENTER MEGHBOURING ALLOTMENTS THROUGH
fog? , OF SURFACE BUMDING OR SCOUR PROTECTED DRAINS, THE
EXISTING ORIVE WAY 10 BE i FENCE MUST REMAIN JN PLACE UNTLL SUCH TIME THAT FISHED
SMASHED AND REMOVED AND i AMDSCAPING AND DRAINAGE MEASURES ARE WSTALLED
KERB AND CHANNEL TO BE
REWSTATED 1 HSC APPROVAL.
ED ¢ noe
APPROVED S.C i
KERB ADAPTOR eee
OR NO 1200(L) 50 Sq. HOWD SPIKES,
1800 ctrs DRIVE 600 INTO
g GROUND.
im wo
>
S TYPICAL SECTION ~ SILT FENCE
©
A
m7
w” a
| is footing
20-40men AGGREGATE a J. without piers 1
HARD Sta oveRAY is founded | The builder/contractor
FOR DRIVE WAYS DURING "Existing timber . above critical | shall confirm all relevant
i retoining wal This footing is depth line and’ levels prior to
Hil: founded below is unstable. | commencing works.
! critical line and is \——tine of
EXISTING KERB ANO CHANNELL : stable. — Lire
TO BE CUT AND REMOVED j proposed Pool
AND NEW ORIVE WAY TO BE; i Excavation or
INSTALLED TO N.S.C STANDARDS. i Piers supporting strip other trench.

60001 -

e °

 
  

INDICATES SHEET PILING, DESIGN AND
INSTALLATION BY OTHERS. BUILDER TO CONFIRM
EXTENT REQUIRED 10 SATISFY CRITICAL DEPTH

Dashed line indicates
Slab thickness for

 

felioning wal UNE, PROTECTION OF NEIGHBOURING STRUCTRES.
(MINIMUM VIBRATION TECHNIQUES TO BE USED.
PRE-AUGERING OR BETTER) TO 8E WITHIN
PROPERTY BOUNDARY LINE. EXISTING
_ ony CROSS FALL wo
sl eh oan ee
Sis 1000 midde PLAN

(Scale 1:200)

 

Sow cut ond Compacted on-site.
breakout BARRIER, SEM-MOUNTABLE, MOUNTABLE sand bed
back of kerb KERB & CHANNEL OR INVERT CROSSING,

(Scole 1:20)

Depth determined

footings or post pad
footings founded into
selected material and below
critical line are considered
stoble.

CRITICAL DEPTH LINE

  

NOTE:

THS DETAIL ALSO APPLIES TO
EXISTING FOUNDATIONS ON
NEIGHBOURING PROPERTIES. SHEET
PILING MUST BE INSTALLED WHERE
EXISTING FOOTINGS WILL BE
FOUNDED ABOVE ANY EXCAVATION
CRITICAL DEPTH LINE

Issue: CONSTRUCTION

SCO mai" “pauses ©

ABN 40 096 481 899

18 DUKE STREET SUNSHINE BEACH QLD.4567
Ph (07) 5447 5544 Fax (07) 5447 2634

Title: Operational Works Plan.
Project Lot 161 Orealla Cres
Sunrise Beach
Date: May 2006 | Drg No. 16115-OW-1|"" A

Loy back Kerb &
Chonnel to S.C
standord.

     
 

MATCH EXISTING
CROSS FALL

   

 
   

 

   

  
  
  

Extend sub-bose 150mm
passed back of kerb.

 
 
      

Subgrode preperation,
refer generat notes,

  

PAVEMENT MATERIALS
25mm Asphollic Surfacing to N.S.C specifications

150 Base course type 2.1 CBR 80

150 Sub-base course {ype 2.3 CBR 45

Sub-grode preperation in accordance with specifications /notes

LAY BACK KERB & CHANNEL

 

Rew, - $001.95

Used in these records

About this file

File size
5.1 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

07_0387 - Op Works - Landscaping, Carparking & Access, Frontage [As Published].pdf · 5.1 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.