Skip to the record
Noosa’s premier civic archive.

Council archive · source document

09/1508 - Operational Works - Landscaping. Stormwater, S&E Control, Carparking & Acess, Frontage Works [As Published] · 142009.1508

of 69

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

J3.6

33.7

J4

J4.1

J4.2

ASSESSMENT NO: 2009/ 0919
Construction of roofs, walls and floors
Design Review

(a) Roofs, external walls, floors and any opening such as a window, door or the like
must be constructed to minimise air leakage in accordance with (b) when forming
part of —

(i) the envelope of a conditioned space; or
(ii) the external fabric of a habitable room or a public area in climate zones 4, 6,
7 and 8.

(d) Construction required by (a) must be- :

(i) enclosed by internal lining systems that are close fitting at ceiling, wall and
floor junctions; or
(ii) sealed by caulking, skirting, architraves, cornices or the like.

(c) The requirements of (a) do not apply to openings, grilles and the like required for

smoke hazard management.

Result
As an air conditioner is to be installed roofs, external walls, external floors and any opening
such as a window, door or the like must be constructed to minimise air leakage as indicated
above.

Evaporative Coolers

An evaporative cooler must be fitted with a self-closing damper or the like when serving-
(a) a heated space; or
(b) — ahabitable room or a public area of a building in climate zones, 4, 6, 7 and 8.

Design Review

An evaporative cooler is not indicated.

Result

Not applicable.

Air Movement

Application of Part

The Deemed-to-satisfy Provisions of this Part apply to a habitable room in a sole-occupancy
unit of a Class 2 building or a Class 4 part of a building. Part J4 is not applicable to Class 3,
5, 6, 7, 8 and 9 buildings.

Air movement

Design Review

Result

Not applicable.

4 Lillypilly Court, Page No.9 Phone: (07) 5493 2981
KAWANA FOREST.....4551. Fax: (07) 5493 3867

Used in these records

About this file

File size
4.9 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

09_1508 - Operational Works - Landscaping. Stormwater, S&E Control, Carparking & Acess, Frontage Works [As Published].pdf · 4.9 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.