Council archive · source document
09/1508 - Operational Works - Landscaping. Stormwater, S&E Control, Carparking & Acess, Frontage Works [As Published] · 142009.1508
ASSESSMENT NO:2009/ 0919 J43 Ventilation openings Design Review Result Not applicable. 34.4 Ceiling fans and evaporative coolers Design Review Result Not applicable. O%-0 Air-conditioning and Ventilating Systems J5.1 Application of Part I5.2 Air-conditioning and ventilating systems Design Review (a) 4 Lillypilly Court, KAWANA FOREST..... An air-conditioning unit or system must- (i) (ii) (iii) (iv) (vy) 4551. be capable of (A) _ being inactivated when the sole-occupancy unit, building or part of the building served is not occupied; and (B) where the air-conditioning unit or system has motorised outside air and return dampers, close the dampers when the air-conditioning unit or system is inactivated. Have any supply and return ductwork insulated and sealed in accordance with Specification J5.2; and when serving more than one sole-occupancy unit, zone or area with a unique thermal] characteristic- (A) _ thermostatically control the temperature of each sole-occupancy unit, zone or area; and (B) not control the temperature by mixing actively heated air and actively cooled air; and (C) limit reheating to not more than 7.5K rise in temperature at the supply air rate for the space served and may be increased or decreased at the same rate that the supply air rate is respectively decreased or increased; and in other than Class 6 restaurant, bar or café or Class 9b building, have an outdoor air economy cycle- (A) _ inclimate zone 3, when the system capacity is over 65kWr; and (B) _inclimate zones 4, 5, 6, 7 and 8 when the system capacity is over 65kWr, have an outside air cycle; and in a Class 3 building be capable of controlling the temperature of a sole- occupancy unit at a different temperature during sleeping periods than during other periods; and Page No. 10 Phone: (07) 5493 2981 Fax: (07) 5493 3867
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
09/1508 - Operational Works - Landscaping. Stormwater, S&E Control, Carparking & Acess, Frontage Works [As Published]Related documentApplication case desk ↗
About this file
- File size
- 4.9 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.