40. A vehicular access driveway and carparking on the site shall be constructed generally in
accordance with plan titled Site-Parking numbered P1 Sheet S2 issue C dated 16/04/09 and
as amended by Council in red. A Development Permit for Operational Works shall be
required.
41. The driveway shall be designed and constructed to Council’s design standards and to grades
that prevent vehicles from scraping and/or bottoming whilst also allowing pedestrians
movements along the footpath without any step or level difference. Should any driveways
be constructed to grades that do not comply with AS/NZS 2890.1-2004 and AS 2890.2-1989,
Council will require that the driveway be removed and reconstructed to levels that do comply.
Please note, a step between the driveway and the footpath must be avoided, as it is preferred
to have the footpath continue at a constant grade to minimise the potential for pedestrians to
trip or fall.
42. To ensure pedestrian safety between vehicles exiting the site and pedestrians on the
footpath, the driveway and any associated fencing or vegetation near the driveway shall
comply with the minimum sight line requirements as defined in AS 2890.1, section 3.2.4. The
applicant shall demonstrate compliance by illustrating these sight lines on the plans
submitted for both Operational Works approval and Building Works approval.
43. All vehicles shall enter and leave the site in a forward direction.
44. The carparking area shall be designed to comply with the provisions of AS/NZS 2890.1-2004
for user class 2 with allowance for vehicles to enter and leave the site in a forward gear and
with a minimum head clearance (headroom) at any point of 2.3m.
45. All carparking shall be kept, maintained and line-marked in a condition fit for use.
Contributions Towards Council Infrastructure
46. Monetary contributions shall be paid to Council towards the cost of providing and/or
upgrading various infrastructure at the rates applicable at the time of payment. An estimate
only of the contribution amounts are outlined in the table below:
Contribution Required For: Stage 1: Stage 2:
PSP 12 – Public Open Space Contributions $14,594 $16,455
PSP 16 - Sewerage Headworks Contributions $17,505 $18,973
PSP 17 - Water Supply Headworks
$28,507 $31,508
Contributions
PSP 20 - Pathway Trunk Network
$3,280 $3,699
Contributions
TOTAL Contribution Amount = $63,886 $70,635
Please note, that these amounts are all subject to variations in the Consumer Price
Index, All Groups Brisbane from September 2009 until the date of payment.
All contributions must be paid prior to commencement of the use.
General
47. A Construction Management Plan for each separate demolition and construction phase of
the development shall be submitted to and approved by Council at least 5 working days prior
to the commencement of any Demolition or Building works or at least 5 working days prior to
the pre-start meeting for Operational Works. The Construction Management Plan shall
include but not be limited to:
Page 7 of 21
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Appendix A - Decision Notice & Approved Plans.pdfRelated documentApplication case desk ↗
About this file
- File size
- 11.6 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.