Original source · versioned page text
Planning Report 60669
Attached to the e-mail Reconfiguration of a Lot (1 Lot into 4 Lots) - RAL17/0504.
not less than the minimum
identified Section 2.3 of PSP5 AND
Engineering Design Standards S7.4 Road networks provide connectivity
– Roads, Drainage and between residential areas, both internally and to
Earthworks; adjoining sites, using access roads
g) minimises the extent of
earthworks required by AND
being sympathetic to the
S7.5 The length of a cul-de-sac does not
terrain;
exceed 200m in urban areas and 500m in rural
h) has no significant adverse
areas;
effects on habitat corridors
or areas of significant AND
native vegetation;
i) does not create noise S7.6 The layout uses street and road design,
attenuation difficulties; including variations in carriageway width, as a
j) incorporates pedestrian and traffic calming measure to encourage lower
cyclist crossings at traffic speeds. (Note: Carriageway widths are
intersections or where required identified in Section 2.3 of PSP5 Engineering
to access high activity nodes Design Standards – Roads, Drainage and
and public transport; Earthworks.)
k) has regard to the potential AND
for conflict between
vehicles, pedestrians and S7.7 On-road cycling treatment is utilised to
cyclists; and provide safe and continuous movement of
l) incorporates on-road cycling cyclists along a roadway such as--
facilities.
a) sealed shoulders;
b) wide kerbside lane;
c) exclusive or peak period bicycle lane;
d) advisory treatments such as Bicycle
Awareness Zone;
e) shared parking / bicycle lane;
f) contra flow bicycle lane; or
g) bus/bicycle lane; AND
S7.8 The provision of bicycle lanes at
intersections is generally in accordance with
AUSTROADS Part 14, section 5 and Manual of
Uniform Traffic Control Devices (MUTCD) Part 9.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.