Inflow and outflow water needs to be collected as paired samples within a short time
frame, with each pair representing the same phase of stormwater activity. The volume
of stormwater generated in the catchment can be calculated by the area of catchment
and intensity of rainfall during the event. The proportionate change in the
the
suspended solids loads in stormwater flowing over the construction site will provide a
measure of the sediment being generated from the construction site.
Herbicide monitoring in stormwater entering and leaving the construction site should be
performed when applications are known to occur, rather than routinely. Some
herbicides have a short residence time, so arrangements may need to be made with the
laboratory for rapid courier service and turnaround time. The monitoring schedule is
listed in Table 11-3
11.2 Water Quality Monitoring During Routine Operation of the Essence of Peregian
Sampling should be performed at sites 1 to 9 (depending upon staging). The temporal
sampling frequency is recommended at monthly intervals for the first 12 months, with
quarterly sampling thereafter (Table 11-3). This temporal frequency is intended to show
the proportional improvement from the existing water quality condition in response to
improved stormwater management associated with the new development. Seasonal
variations can be identified from the quarterly samples. Herbicide monitoring is as
described for the construction phase.
Table 11-3: Monitorin ~ Schedule for the Construction and Operational Development
Site Site Site Site Site Site Site Site Site Site Site Site Site Site
Parameter
1 2 3 4 5 6 7 8 9 10 11 12 13 14
)’. .
"
Rainfall S
.
. . . . . . .
pH M M M M’ M M M M M’ .
. . . . . . . .
Dissolved M M M M’ M M M M M
oxygen
’ .
. . . . . . .
.
BODs M M M M’ M M M M M
. . . . . . . ".
Suspended M M M M’ M M M M M S S S S
r
Solids
. . . . . . . .
Total M M M M’ M M M M M
Nitrogen
. . . . . . . .
Total M M M M’ M M M M M
Phosphorus
. . . . . . . .
Herbicides M M M M’ M M M M M S S S S
. . . . . . . . .
Faecal M M M M M M M M M
coliforms
. . . . . . .
Enterococci M M M M’ M M M M M’
. . . . . . . .
Turbidity M M M M’ M M M M M
M _
monthly monltonng dunng construction and dunng the first two years of operation; quarterly mOnltonng dunng
the second year and thereafter,
S = Monitoring during stormwater flow events
@2012 Simmonds & Bristow Pty LId Contrast Constructions J-1005-310 _
22 March 2012
I :\CLlENTFILES\Contrast Constructions\1108-155c -
Essence of Peregian SCEP Stage 1 Updatel09 _
Output Documentsl11 08-155C_SWMP
SCEMP_Scanlon Property Group_V4 O_ta_120321,doc Page 21 of 24
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Response to Information Request - Received on 19/04/2012Related documentApplication case desk ↗
About this file
- File size
- 89.8 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.