12.0 CONDITIONS AND LIMITATIONS
The data contained in this volume has been commissioned by Scanlon Property Group, Limited
on behalf of Thomco Pty Limited, to support a Development Application for Operational Works
associated with the development known as ’Essence of Peregian’ located at 215-219 David
Low Way, Peregian Beach.
In preparing this report, Simmonds and Bristow has, in part, relied on survey data, flood level
data, calculations and previous reports prepared by Council and external consultants to support
the original development application, and the preparation of Joint Experts Reports for the court
ordered mediation process associated with the preparation of the negotiated approval
conditions.
While reasonable precautions have been taken to validate the data provided before its
incorporation into modelling and design procedures, the absolute accuracy of such data cannot
be guaranteed with certainty and may vary over time as site conditions change. As such, it is
anticipated that minor changes may be required on site to allow the recommendations of this
plan to be implemented effectively.
Minor or temporary changes to accommodate on-site conditions during the construction phase
should be made in consultation with a suitably qualified and experienced professional engineer
or qualified sediment and erosion control specialist. ."
Any proposed permanent changes required to the layout, geometry, depth and/or volume of
bioretention trenches and/or wetland elements as a result;’of any site conditions that are
different to those assumed and modelled during design, shou’ld be referred back to the
designer, or to a suitably experienced and,qualified stormwater management consultant, and
resubmitted to Council for compliance re-certification and approval.
The Stormwater Management Report contained within this repbrt comprises of all constituent
parts of the report in full, including the text, calculation summary and appended drawings. If
additional copies of this repp,rt are required, separate sections or individual pages must not be
copied in isolation. Ii,
Except for archival and record keeping purposes, this report should not be copied and stored in
any electronic media or passed onto other parties without the express written permission of
Simmonds & Bristow.
No part of this report may be copied or used for any other purposes other than the purpose
stated in this report.
@2012 Simmonds & Bristow Pty LId Contrast Constructions J.1005-310 -
22 March 2012
I :ICLlENTFILESIContrast Constructionsl11 08-155c - Essence of Peregian SCEP Stage 1 Updatel09_Output Documentsl11 08-155C SWMP
_
SCEMP_Scanlon Property Group_V4 O_ta_120321.doc Page 22 of 24
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Response to Information Request - Received on 19/04/2012Related documentApplication case desk ↗
About this file
- File size
- 89.8 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.