EP-SECP-03: Designated on-site stockpiles and waste receptacl s"
.1.ObjectivesfTargets To keep building materials and building waste on-site
2. Management Strategy Containment of stockpiles and building waste wholly on the building site.
3. Tasks/Actions 1) Install skips or reo-cages in which to place waste, at multiple sites of
convenience across the site, so that winds cannot blow the waste off-site;
..
"’;.{ ;\’1 ~’.
’"
~.
"
2) Have a designated site for stockpiling excavated earth, building sand,
~~
building materials. Ensure that the stockpiles have designated covers with
-
"’!’ ,’:t-’
.
",,"-
~ 4:,.
t::.. !:;,
pegs to protect them from wet weather, and are sufficiently distant from
_,.’. ~
~
~- "
’",
’"II kerbside drains;
i..,$, ’"
3)The designated area for cement and paint materials must be away from
if
P:" kerbside drains;
.’ :(j, ,
~
4) Install a geo-Iog upslope to divert flow around the stockpile;
,.;";:-: ,,
.,
5) Install a sediment fence down-slope of stockpile area to collect sediment;
"
" -
h ,
and
~
,
~ ~j N
,
.
6)At the end of each day, or before the onset of rain, cover and securely
~~ (>’I,;;;,
peg stockpiles. Ensure that waste has been placed in the waste receptacle.
!
.
4.Pe ormance ,
..
.
1) Sediment accumulation against the sediment fence;
Indicators ~
2) Stockpile covered when required; and
~
(" fl
)l1l" "’, 0."1
,,"
3) Effective containment of waste.
.
’:1 1:’:."
"
5. Monitoring ~ 1) Inspection of geo-Iog and sediment fence for structural integrity;
M .’
!
~
,~., _l4-:- ’~ ,~
2) Inspect the sediment fence for sediment accumulation;
"-
’:’Il
";
":’,~-\ ~
1
l;.-:~;o t"
Ii.~:
3) Inspection of stockpile for effective cover, or wetness and erosion if cover
r:
I
has been removed; and
K!:t ’,,".~ "
"
1 ~).l ~
:lI
oot.
4) Inspection of the ’/{aste ~eceptacle and building site for litter containment.
6. Frequency/Deadlines Daily inspection. ~ .1
7. Responsibilities
~ ~;)
Building contractor.
8. Reporting and Exception reporting’to the site manager and senior management.
Review
"TI
9. Contingency When l ss of materials from the stockpiles and waste receptacles is
occurring:
’.
; ’,.. .~ i~
’t;
i8;
r; ~~, II Waste Receptacle
)II
’:1 !a
,’i:z
!_f,f"
I
..
1) Report situation to site manager immediately, and request support;
2) Collect loose litter and place in bags;
, ’;..J’:
,
":. ~ - 3) Identify point of failure in waste receptacle and temporarily bridge the
if’
’:f,
~
,
-
point of failure;
~ ,
::
Ole’
- 4) Place bagged litter in waste receptacle;
1% r\: %
P’
~t 5) Initiate corrective actions.
" j
,
. A
Stockpile
, ,
" ,
1) Report situation to site manager immediately, and request support;
rJ . ~ V,’~
;. [i
i 2) Identify points of failure in upstream flow control or downstream sediment
fence. Place sandbags upslope to divert flow away from the points of
W
&-1 I~~:;: ,;:’^:li,~-’ "’I’" failure;
I,
:t: "f’
...’
,1
3) Initiate corrective actions;
..
r.,Wj ~~
,
fl""
4) Collect water quality samples at inflow and outflow points (section 11).
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Response to Information Request - Received on 19/04/2012Related documentApplication case desk ↗
About this file
- File size
- 89.8 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.