Skip to the record
Search everything, all in one place.

Council archive · source document

Response to Information Request - Received on 19/04/2012 · OPW11/0335

of 122

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (89.8 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.

Original PDF page 67, section 1. The text section number identifies this passage in the reader.

EP-SECP-03: Designated on-site stockpiles and waste receptacles

10. Corrective actions                                                                                                                   1) Repair geo-Iogs, perimeter stockpile covers, waste receptacles, and
                                                                                                                                         sediment fences if required;

                                                                                                                                         2)Address upslope controls if required (refer to EP-SECP-01);

                                                                                    ,                                                    3) Building contractor to reinforce the need to keep a tidy site and cover
                                                                                                                                         stockpiles.

                                                                                                                                                                                         -

                                                                                                                                                                                     "


EP-SECP-04: Down slope sediment controls

1. ObjectivesfTargets                                                                                                                    To reduce the transport capacity of stormwater exiting the site, and remove
                                                                                                                                         sediment from stormwater entering the site.
i!l

                                                                                                                                         To prevent pollutants from the building site entering Noosa National Park

2. Management Strategy                                                                                                                   1)Slow the velocity of stormwater flowing across the building site;
                                                                                                                                         2) Use sediment fences to pond stormwater at strategic points in the
~~!                                                                                           ~                                          building site, so that suspended sediment can settle;
                   l        ft                                                 ’;_’.’Ii                               !
                                                                                          ~                                ,

                       ’~
                               s.
                                 ~                                                                                                       3) Direct stormwater from sediment fences over grass filter strips onto
             "’.t::~"f(;                                                                                                                 which suspended sediment can settle;
                                                                                    ;1"’: II;
iii                                                    s                                                         ’II.
                                                           .,

                                                  \J.w
                                                                                           ~",: ,
                                                                                                                ~"                       4) Install filter socks in the sediment fence against the wetland to passively
           ~
                               ~>!
                                                                                        ";’                     ,      <                 filter sediment from stormwater entering the terminal wetland; and
                                              "’{                ’’’’



                                 t;IO’?~ 3:                                                                     ~:,~.                    5)Sediment curtain in the heath wetland to contain sediment that may have
                                 ..                                                 .
                                                                                        :’1-.
                                                                                                        ~.~.
                                                                                                                                         passed the upstream ~control measures.
3. Tasks/Actions                                                                                                                         1) Install geo-textile sediment fences on the lower slopes of the building
                                                                                                                                         site. Posts should be minimum of 2 m spacing, the base should be buried
       ~
                                                                                                ..                  ~
                                                                                                                               ~         at least 200 mm belbw ground. the fenc          s should be concave   upslope to
           ~
                       ,
                               -:..
                                      ,                                          ~>fJ,     o_
                                                                                                !
                                                                                                    ~           ~
                                                                                                                 ~         m             bund stormwater, whi         allowing lateral 6verfl w down-slope;
                                                                                                                                         3) Stabilise grouncNhat accommodates overflow from the sediment fences
                                                                               .
                                                                                   d                    ’I



                                                                                                        .~
             ,

                       ..1’                         ~
                                                            .




                                                     1i"llJ;’!
                                                                                          1
                                                                                                    ~
                                                                                                    !
                                                                                                         , .
                                                                                                                                         to avoid rill development. Refer to     EP-SEiCP-05;
                                                                                                                                                                  ~
                       ~~ 11
       :J        .’1                                   ~                                                                                 4) Direct overflow into’down-slope sediment fence. Filter socks will be used
                                                      J’(’j
                                                                                                                                         as a final barrier to contain suspended sediment. Overflow through the filter
                               ",                                                                  ..
       ,l ;f;J                       iJ       _            .~
                                                                                                                                   ,
                                      Ii
                 ;;:
                                                       .~                 y".,n                                     ~
                                                                                                                                         socks will be into th    heath wetland. Use water from the terminal wetland to
             ;



                                                                                                                                         irrigate grol;!.nd.cov~r (ref r to EP-SEC -05);
                                                                                                             ~


           ""
                       ’^’F               .   ...


      ;f.J      ;"!~Ii, Ir-
                        t..~’l        .,f:                                                                       I;’
                  "
                                                  ’Y:I"l l,             ~...    ~’);’         or
                                                                                                                                         5) Install a sediment curtain in the heat.h wetland to contain any fine
                                                                                                   ,1       ,

                                                                                                            ~
                                                                                                                       .




                                                                                                                                         sediment’in overtopped sto mwater. This sediment will settle out in the
                                                                ~i.,
                                                     :f";: 1"
                                                                                                    r’i’j
      I~~i~:l..>l
                                                     ’l.~
                                                                ’"

                                                                                                    ’,J             ~.’.
                                                                                                                           "             wetland behind the sediment screen.
                                                                                                                    J
             l?                                                            ..,


                                                                                                    ,~
                                                                                                                                         6) Install temporary downpipes from newly constructed roofs.                       ~\

4.Pe                           ormance.                                                                                                  1) No rill development;
Indicators
                                                                                                                                         2) Low turbidity of sediment in overflow from the sediment fence into the
                                                                               i
                                                                                          Jj"-~                                          heath wetland;
                                 !                          I
                                                                                    :~.             .

                                                                                                         ’
                       I>~’i                  ~.s"                                  i!
                                                                                        "J                                               3) Containment of stormwater behind the sediment curtain in the heath
                                                                                                             ~
           ,
                 r.t’.
                                          ;,t:!                                                                                          wetland; and
                                                    0);,         ~

                                                                                                                                         4) Prompt connection of temporary downpipes on the building site.
5. Monitoring                                                                                   ~                                        1) Rills are absent from the building site;
                                                                                                ~



                                                                                                                                         2) Build up of sediment behind sediment fences should be no more than 1/3
                                                                ,

        ,                                         ~.               ,
                                                                                                                                         of the fence height;
                                                                         ~
                                                                   .
       I                 ,


                        ,


      ;
                                      :
                                       .
                                                  :
                                                            ~~
                                                                               .{"
                                                                               .
                                                                                                   ,

                                                                                                   ~,
                                                                                                                                         3) Sediment fences should be structurally sound;
                                                           "’




                                                                                         ;11
                                                      [~.
                                                                               ~~                  or
                                                                                                                                         4) Suspended solids in overtopped stormwater entering the heath wetland
                                                            t’J!
                                                                                                                                         are not excessively high when compared with suspended solids entering
                                              "~                               "t
                       lOJ"                                                               !.Ii!1:-
           r
                                                  of"
                                                                                                                                         the construction site.

6. Frequency/Deadlines                                                                                                                   1) Inspection for rills: immediately after rainfall events;

                       ~
                                                                                                                                   i1j
                                                                                                                                         2) Inspection of sediment fences for structural integrity and sediment.



                       ~
                "[j                                                                                                                      accumulation: weekly and immediately after a rainfall event;
                   "

Used in these records

About this file

File size
89.8 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Response to Information Request - Received on 19_04_2012.pdf · 89.8 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.