EP-SECP-03: Designated on-site stockpiles and waste receptacles
10. Corrective actions 1) Repair geo-Iogs, perimeter stockpile covers, waste receptacles, and
sediment fences if required;
2)Address upslope controls if required (refer to EP-SECP-01);
, 3) Building contractor to reinforce the need to keep a tidy site and cover
stockpiles.
-
"
EP-SECP-04: Down slope sediment controls
1. ObjectivesfTargets To reduce the transport capacity of stormwater exiting the site, and remove
sediment from stormwater entering the site.
i!l
To prevent pollutants from the building site entering Noosa National Park
2. Management Strategy 1)Slow the velocity of stormwater flowing across the building site;
2) Use sediment fences to pond stormwater at strategic points in the
~~! ~ building site, so that suspended sediment can settle;
l ft ’;_’.’Ii !
~ ,
’~
s.
~ 3) Direct stormwater from sediment fences over grass filter strips onto
"’.t::~"f(; which suspended sediment can settle;
;1"’: II;
iii s ’II.
.,
\J.w
~",: ,
~" 4) Install filter socks in the sediment fence against the wetland to passively
~
~>!
";’ , < filter sediment from stormwater entering the terminal wetland; and
"’{ ’’’’
t;IO’?~ 3: ~:,~. 5)Sediment curtain in the heath wetland to contain sediment that may have
.. .
:’1-.
~.~.
passed the upstream ~control measures.
3. Tasks/Actions 1) Install geo-textile sediment fences on the lower slopes of the building
site. Posts should be minimum of 2 m spacing, the base should be buried
~
.. ~
~ at least 200 mm belbw ground. the fenc s should be concave upslope to
~
,
-:..
, ~>fJ, o_
!
~ ~
~ m bund stormwater, whi allowing lateral 6verfl w down-slope;
3) Stabilise grouncNhat accommodates overflow from the sediment fences
.
d ’I
.~
,
..1’ ~
.
1i"llJ;’!
1
~
!
, .
to avoid rill development. Refer to EP-SEiCP-05;
~
~~ 11
:J .’1 ~ 4) Direct overflow into’down-slope sediment fence. Filter socks will be used
J’(’j
as a final barrier to contain suspended sediment. Overflow through the filter
", ..
,l ;f;J iJ _ .~
,
Ii
;;:
.~ y".,n ~
socks will be into th heath wetland. Use water from the terminal wetland to
;
irrigate grol;!.nd.cov~r (ref r to EP-SEC -05);
~
""
’^’F . ...
;f.J ;"!~Ii, Ir-
t..~’l .,f: I;’
"
’Y:I"l l, ~... ~’);’ or
5) Install a sediment curtain in the heat.h wetland to contain any fine
,1 ,
~
.
sediment’in overtopped sto mwater. This sediment will settle out in the
~i.,
:f";: 1"
r’i’j
I~~i~:l..>l
’l.~
’"
’,J ~.’.
" wetland behind the sediment screen.
J
l? ..,
,~
6) Install temporary downpipes from newly constructed roofs. ~\
4.Pe ormance. 1) No rill development;
Indicators
2) Low turbidity of sediment in overflow from the sediment fence into the
i
Jj"-~ heath wetland;
! I
:~. .
’
I>~’i ~.s" i!
"J 3) Containment of stormwater behind the sediment curtain in the heath
~
,
r.t’.
;,t:! wetland; and
0);, ~
4) Prompt connection of temporary downpipes on the building site.
5. Monitoring ~ 1) Rills are absent from the building site;
~
2) Build up of sediment behind sediment fences should be no more than 1/3
,
, ~. ,
of the fence height;
~
.
I ,
,
;
:
.
:
~~
.{"
.
,
~,
3) Sediment fences should be structurally sound;
"’
;11
[~.
~~ or
4) Suspended solids in overtopped stormwater entering the heath wetland
t’J!
are not excessively high when compared with suspended solids entering
"~ "t
lOJ" !.Ii!1:-
r
of"
the construction site.
6. Frequency/Deadlines 1) Inspection for rills: immediately after rainfall events;
~
i1j
2) Inspection of sediment fences for structural integrity and sediment.
~
"[j accumulation: weekly and immediately after a rainfall event;
"
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Response to Information Request - Received on 19/04/2012Related documentApplication case desk ↗
About this file
- File size
- 89.8 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.