Original source · versioned page text
Nandroya Planning Report
Attached to the e-mail MCU16/0066_Further info re: Representations regarding stormwater 6 Taylor Court Cooroy.msg.
leddy sergiacomi & associates pty. itd. LSA Ref: 45-021 2.3.2 2.3.3 2.3.4 > Dam wall stability assessment; and > Site classification in accordance with AS2870. The Morrison Geotechnic Investigation has been included as Appendix A of this report. Soil Classification Nineteen (19) boreholes were advanced on the site using a light 4+WD mounted auger rig and classified to AS1726 Geotechnical Site Investigations. Soils encountered comprised predominately natural material with some fill (as shown on Figure 1 of the Morrison Report). Generally, the boreholes advanced on the subject site found medium to high plasticity, stiff to very stiff, brown to brown-reds and brown-orange silty clay and sandy clays at shallow depths, becoming darker brown, grey and mottled at increasing depth (>1.0m). The soil was generally moist with some laterite gravels found at depths of >1.0m also. The presence of shallow fill (<1 metre depth) on the site was found in Boreholes 1, 6, 7, 8, 9, 11, 12, 13, 16, 17 and 18, with greater depths encountered on the edges of the cut and fill platforms previously established and used for timber storage (refer Boreholes 10 (>1.7 metres), 14 (2.1 metres), 15 (1.35 metres)) and associated with excavation of the dams (refer Boreholes 2 (2.1 metres)). Where greater depths of fill were encountered, the material was considered relatively synonymous in composition to the natural sub-soil profile, apart from the material found in BH10 and BH15 which consisted of timber waste and sawdust, covered by a thin layer of clay material. Groundwater Groundwater was encountered in BH2 at a depth of 2.7m. This borehole was situated in close proximity to the dam and is likely to represent seepage from the dam itself. No evidence of groundwater in any other boreholes was found. Field Permeability Five (5) permeability tests were carried out using a constant head permeameter at the locations shown on the site plan of the Morrison Geotechnic Report. Results for the field permeability results ranged from 1.7x10% to 3.9x10*. These results are consistent with Table 4.2A4 of 14 November 2005 Department of State Development, Trade and Innovation Page: 5 Planning Report
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.