Skip to the record
Search everything, all in one place.

Original source · versioned page text

Nandroya Planning Report

Attached to the e-mail MCU16/0066_Further info re: Representations regarding stormwater 6 Taylor Court Cooroy.msg.

of 71

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

leddy sergiacomi &
associates pty. itd.

LSA Ref: 45-021

 

4.5.3

4.5.4

The balance of the property comprising proposed Lot 4 is to retain the existing use, comprising
the Boral Timber Australia site office. This equates to a commercial business Type 1 Office: The
use of premises for a commercial business conducted in an office environment. The use includes

a bank, professional office, travel agent, and estate sales office.

Assessment Table for Rural Zone

Table 6.8 of Council’s Draft Planning Scheme details the assessment categories and relevant

assessment criteria for the rural zone and nominates that a number of uses are consistent within

the Rural Zone and located on the subject land. These include the following:

> Commercial Business Type 1 office where located on Lot 1444 on CG3956 and associated
with Forestry uses; or

> Industrial Business Type 2 production, alteration, repackaging & repairing where located on
Lot 1444 on CG3956 and associated with Forestry uses; or

> Retail Business Type 3 landscaping and rural.

All identified uses are impact assessable under the Draft Scheme.

Table 6.11 details the level of assessment for development other than a material change of use

and defines the lot reconfiguration component as code assessable pursuant to the Draft Scheme.

Overall Outcomes for the Cooroy & Lake Macdonald Locality
Section 6.8.2 of the Draft Scheme details a number of overall outcomes sought for the Cooroy &
Lake Macdonald Locality. Of these, the following are considered relevant to the site:
b) The Cooroy and Lake Macdonald Locality supports a growing urban and rural settlement of
permanent residents;
c) Cooroy retains its role as the major business centre for the Shire’s hinterland area; and
h) Economic activities are focused on:
i Cooroy’s role as the principal business and service centre for the hinterland;
ii Cooroy’s industrial estate;
ili technology based businesses reliant on broadband communication; and

iv timber industry initiatives and product manufacturing at the Nandroya Mill site.

 

14 November 2005 Department of State Development, Trade and Innovation Page: 49

Planning Report
Log in to download the original file

Nandroya Planning Report.pdf · 8.0 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.