Original source · versioned page text
Nandroya Planning Report
Attached to the e-mail MCU16/0066_Further info re: Representations regarding stormwater 6 Taylor Court Cooroy.msg.
leddy sergiacomi &
associates pty. itd.
LSA Ref: 45-021
Specific Outcomes "Probable Solutions (if code assessable)
Forestry uses;
{c) Home-based businesses;
(d) Industrial business Type 2 located on Lot
1444 on CG3956 and associated with
Forestry uses;
(e) Industrial business Type 3;
(f) Retail business Type 1 if a roadside stall;
(g) Retail business Type 3;
(h} Emergency service Type 2;
(i) Open space Type 2 where located outside
of the water catchment area as depicted
on the Overlay Map OM3.5.
(j} Detached house;
(k) Ancillary dwelling unit;
(|) Multiple housing Type 1; and
(m) Visitor Accommodation Types 1, 2 or 3
where located outside of the water
catchment area as depicted on Overlay
Map OM 3.5.
079 The following defined uses and use classes The proposed development is consistent with
are inconsistent uses and are not located in these provisions.
the Rural Zone—
(a) Commercial business Type 1 if not
located on Lot 1444 on CG3956 and
associated with Forestry uses;
(b) Commercial business Type 2;
(c) Entertainment and dining business;
(d) Industrial business Type 1;
(e) Industrial business Type 2 if not located
on Lot 1444 on CG3956 and associated
with Forestry uses;
(f) Retail business Type 1 if not a roadside
Stall,
(g) Retail business Types 2, 4, 5, 6 or 7
(h) Education;
(i) Emergency service Type 1;
(j) Open space Type 1; or
(k) Open space Type 2 where located within
the water catchment area as depicted on
the Overlay Map OM 3.5;
(|) Wellbeing;
(m) All infrastructure Uses;
(n) Multiple housing Types 2, 3, 4 or 5;
(0) Visitor Accommodation Types 1, 2 or 3
where located within the water catchment
area as depicted on the Overlay Map OM
3.5; and
Visitor accommodation Type 4.
4
Sloping sites and ridgelines $80.1 The development of the site is not
080 Development on s/oping sites— adversely affected by the slope of the land, with
(a) is responsive to the natural topography of | all slopes well below 1 on 3.
the site;
(b) by stepping along or with the slope of the | All measures will be undertaken to ensure
site; stormwater runoff is managed appropriately. The
14 November 2005 Department of State Development, Trade and Innovation Page: 52
Planning Report
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.