Original source · versioned page text
Reference Document - OPW25 0085 (AS Published)
Very large file (18.3 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Contents
1. Introduction ............................................................................................................................................................ 1
2. Proposed Development ....................................................................................................................................... 1
3. Aims & Method of investigation .......................................................................................................................3
3.1 Fieldwork ...................................................................................................................................................................... 3
3.2 Laboratory Testing ................................................................................................................................................... 3
4. Results of Investigation ...................................................................................................................................... 4
4.1 Site Description ......................................................................................................................................................... 4
4.2 Topography................................................................................................................................................................. 7
4.3 Surface Drainage ....................................................................................................................................................... 7
4.4 Vegetation ................................................................................................................................................................... 8
4.5 Buildings and Other Structures ........................................................................................................................... 8
4.6 Geology ........................................................................................................................................................................ 8
4.7 Subsurface Conditions ............................................................................................................................................ 9
4.8 Groundwater............................................................................................................................................................. 10
4.9 Geotechnical Laboratory Test Results ............................................................................................................. 11
5. Slope Stability Assessment ............................................................................................................................... 12
5.1 Existing Conditions................................................................................................................................................. 12
5.2 Slope Stability Assessment.................................................................................................................................. 13
5.2.1 Qualitative Assessment ....................................................................................................................... 13
5.2.2 Numerical Modelling ........................................................................................................................... 14
6. Geotechnical Recommendations ..................................................................................................................... 16
6.1 Site Layout and Geotechnical Constraints..................................................................................................... 16
6.2 Earthworks ................................................................................................................................................................. 16
6.2.1 Site Preparation and Trafficability................................................................................................... 16
6.2.2 Excavations .............................................................................................................................................. 17
6.2.3 Batter Slopes ........................................................................................................................................... 18
6.2.4 Filling ......................................................................................................................................................... 18
6.3 Building Foundations ............................................................................................................................................ 19
6.3.1 Site Classification .................................................................................................................................. 19
6.3.2 Footing Design....................................................................................................................................... 19
6.4 Retaining Structures .............................................................................................................................................. 20
6.5 Drainage ..................................................................................................................................................................... 21
6.6 Pavement Design Parameters ............................................................................................................................ 22
6.7 Geotechnical Certification of Operational Works ....................................................................................... 22
7. Wastewater Treatment and Disposal ............................................................................................................ 23
7.1 Wastewater Flow Design Allowance ................................................................................................................ 23
7.2 Terrain-Soil Assessment ....................................................................................................................................... 23
7.3 Recommendations ................................................................................................................................................. 24
7.3.1 System Type ............................................................................................................................................ 24
7.3.2 System Positioning ............................................................................................................................... 24
7.3.3 System Construction ............................................................................................................................ 26
Geo-Environmental Investigation for Proposed Subdivision
7 February 2025 | 24386-001-Rev0 iv
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.