Original source · versioned page text
Reference Document - OPW25 0085 (AS Published)
Very large file (18.3 MB): the original may take a few minutes to open or download. The page text below is quick to read.
7.3.4 Maintenance and Inspection ............................................................................................................ 26
7.3.5 Water Resource Catchment Overlay .............................................................................................. 27
8. Limitations ............................................................................................................................................................ 27
Tables
Table 1: Summary of Subsurface Profiles ................................................................................................................................ 9
Table 2: Summary of Quality of Materials Testing............................................................................................................. 11
Table 3: Stability Risk Levels ....................................................................................................................................................... 13
Table 4: Details of Qualitative Risk Assessment for Property (AGS 2007) ................................................................ 14
Table 5: Retaining Wall Design Parameters.......................................................................................................................... 21
Text Figures
Text Figure 1: Conceptual subdivision layout, courtesy of IPS........................................................................................ 1
Text Figure 2: Conceptual earthworks plan for the subdivision, courtesy of Walsh ............................................... 2
Text Figure 3: 2025 aerial image of the site and surrounds (courtesy of Nearmap imagery) ............................. 4
Text Figure 4: North-easterly view across proposed Lots 8, natural drainage line behind .................................. 5
Text Figure 5: Oblique drone image of the site looking south-west along the central ridgeline ..................... 5
Text Figure 6: Looking east across the natural drainge line, drone image................................................................. 6
Text Figure 7: Drone image looking north, towards Hoy Road ...................................................................................... 6
Text Figure 8: Image showing ground surface contours (courtesy of QGlobe)........................................................ 7
Text Figure 9: Extract from Gympie Surface Geology Map .............................................................................................. 8
Text Figure 10: Typical subsurface profiles TP1 - sandstone (LHS) and TP7 - siltstone (RHS) .......................... 10
Text Figure 11: Extract from SCC landslide hazard overlay mapping ......................................................................... 12
Text Figure 12: Slope/W analysis output for proposed residential construction – short term
conditions .............................................................................................................................................................................. 15
Text Figure 13: Footing depth required to minimize risk of undermining and surcharging ............................. 20
Text Figure 14: Location of site relative to Mary River ..................................................................................................... 27
Figures
Figure 1: Site Plan
Appendices
Appendix A Test Pit Logs & Explanatory Notes
Appendix B Geotechnical Laboratory Test Certificates
Appendix C AGS Guidelines – Qualitative Terminology for Use in Assessing Risk to Property
Appendix D Limitations
Geo-Environmental Investigation for Proposed Subdivision
7 February 2025 | 24386-001-Rev0 v
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.