Council archive · source document
Appendix B - Geotechnical Assessment · OPW23/0179
Project No. PG-10375 Page | 9 June 2023 Ref: PG-10375, 2023-06-09, LTR VER 1 Michael Cullen – Geotechnical Investigation - Proposed Residence, 128 Gympie Terrace, Noosaville Assuming an excavation depth of 3m for the basement, it is expected indurated sands will be exposed across the basement floor. Provided sands above the indurated sands are removed, an allowable bearing pressure of 300kPa could be adopted in the indurated sands. If any sands remain across the base of the excavation, provided they are compacted to a minimum Density Index of 75%, an allowable bearing capacity of 200kPa could be adopted for the foundation design. Where sands are exposed at the foundation level, this compaction could be achieved through the over-excavation of the founding soils, compaction of the exposed material and the replacement of the excavation using “clean” sand. It should be noted some difficulties have been experienced in compacting sands and particularly silty sands immediately above the indurated stratum, due to the difficulties in suitably dewatering. It is strongly recommended that if a high-level footing raft type system is to be adopted, sufficient “clean” sand from higher in the excavation profile be stockpiled on-site, to allow for the replacement of the silty sands at the founding level, or the sands removed to expose the indurated sand. It should be further noted that immediately below the indurated sand layer, weaker soil layers may be present that were not identified as part of the geotechnical investigation. It is strongly recommended that following excavation to the basement floor level that additional testing be carried out under the supervision of Pacific Geotech to further assess the nature of the soils below the indurated sands. To enable the required ground improvement works to be undertaken, the following earthworks operation is recommended: i. Install the temporary retention system and dewatering system. ii. Dewater the site to at least 0.6m below the excavation level or to the top of the indurated sand. iii. Excavate the site to the design basement level and test the base of the excavation to determine the extent of over-excavation required (if any). iv. Following determination of the required extent of over-excavation, excavate the site to the required level and compact the exposed sands using a large (300kg plus) vibrating plate compactor or a small smooth drum roller. It should be noted that the silty sands encountered at the test locations could be difficult to compact and manage, if not appropriately dewatered. It may be necessary to remove the silty sands and replace them with clean sands from higher in the excavation profile or extend the foundation into the underlying stiff clays.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Appendix B - Geotechnical Assessment.pdfRelated documentApplication case desk ↗
About this file
- File size
- 2.2 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.