ORDINARY MEETING MINUTES 21 MARCH 2019
to avoid damaging of the filter media or subjecting the filter media to
excessive sediment loads.
64.2.5 Are provided with a free-draining outlet from the sub-soil drainage
system.
65. All stormwater quality treatment devices must be maintained in accordance with a
Maintenance Manual prepared for the development by a qualified person and
submitted to Council prior to the issue of any Development Permit for Operational
Works. The Maintenance Manual must include:
65.1 A plan showing the location of the individual components of the system
65.2 For proprietary products the manufacturer’s data and product information
sheets
65.2.1 For bioretention basins reference to the Water By Design
Maintaining Vegetated Stormwater Assets and Rectifying vegetated
stormwater assets
65.3. Location of inspection and monitoring points shown clearly on the plan
65.4. A schedule or timetable for the proposed regular inspection, maintenance
and monitoring of the devices.
65.5 For proprietary products a maintenance contract of a minimum 10 years to
demonstrate that the proprietary product shall be maintained as per the
manufacturers specifications.
65.6 Details of the location and method for maintenance of any proprietary
products to demonstrate that collected pollutants and nutrients shall be
disposed of in accordance with relevant legislation.
Records of all maintenance activities undertaken must be kept and made available
to Council upon request.
72. The fire-fighting demand on Unitywater’s water supply system from the
development must comply with Unitywater requirements and industry standards.
C. Delete conditions 44, 45 and 80.
D. Include the following new condition
81. Any proprietary stormwater quality improvement device included to achieve the
required stormwater quality Management Objectives specified in Section 4 of the
Girraween Stormwater Management Plan, must demonstrate only be granted an
Operational Works Approval on the following provisions:
a. A suitably qualified and experienced professional must provide independent
verification that the parameters within the node for the device in MUSIC
modelling have been tested and verified as per Stormwater Australia (2018)
Stormwater Quality Improvement Device Evaluation Protocol. Version 1.2
December 2018 to achieve the predicted outcomes in the MUSIC model for
the development. For the purpose of this condition, the suitably qualified and
experienced professional must be able to demonstrate a minimum 10 years
urban stormwater testing and modelling experience and be verified in writing
by Stormwater Australia as having an appropriate reputation and track record
within the stormwater industry to provide such independent advice.
b. Where testing to achieve the certification of the proprietary stormwater
quality improvement device is from an area with rainfall intensities and
patterns that are statistically inconsistent with the region of the Noosa Shire
that the device is to be installed, and / or the size of the development the
device has been tested on is more than 2500m2 smaller than the
Page 15 of 21