Original source · versioned page text
2019-03-21 Ordinary Meeting Minutes
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
ORDINARY MEETING MINUTES 21 MARCH 2019
development the device is proposed to service, the following additional
conditions apply:
i. The proprietary stormwater device treatment train must be tested and
re-verified in accordance with the Stormwater Australia (2018)
Stormwater Quality Improvement Device Evaluation Protocol. Version
1.2 December 2018. A suitably qualified and experienced professional,
as verified by Stormwater Australia must use the results from the onsite
testing to re-run the MUSIC node for the proprietary devices and
confirm whether or not the required pollutant reduction efficiencies of
80% reduction in Total Suspended Solids, 60% reduction in Total
Phosphorous and 45% reduction in Total Nitrogen for the overall
development are delivered.
ii. Where the field results and re-run MUSIC node demonstrate the
required pollution reduction efficiencies for the development are not
met, the applicant must implement additional measures to achieve the
required pollution reduction targets. The additional measures must
include, in order of priority, elevated maintenance, and then increased
treatment capacity of the stormwater quality improvement devices.
Following application of additional measures, the system must be
retested in accordance with Stormwater Australia (2018) Stormwater
Quality Improvement Device Evaluation Protocol. Version 1.2
December 2018. Where pollution reduction targets continue to not be
demonstrated the proprietary device must be removed and replaced
with a bio-retention device constructed in accordance with an
Operational Works approval or the applicant must enter into an
agreement with Council to provide improved water quality outcomes
within the catchment area.
iii. A separate water quality performance bond must be provided prior to
any pre-start meeting for the development. The water quality
performance bond must be 150% of the cost of water quality monitoring
required to comply with Stormwater Australia (2018) Stormwater
Quality Improvement Device Evaluation Protocol. Version 1.2
December 2018. The performance bond will be incrementally returned
annually for the value of monitoring works completed that year. The full
value of the bond shall be returned upon demonstration that the
development delivers the required pollution reduction targets.
E. Note the report is provided in accordance with Section 63(5) of the Planning Act 2016.
Carried.
Page 16 of 21
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.