Skip to the record
For the highest quality transcripts.

Original source · versioned page text

Att5 - Traffic Impact Report

of 41

Page text shows just the words. Original shows the document exactly as it was published.

                                                                   Design Response
         Performance outcomes                Acceptable Outcomes
    1. are durable enough to carry
       estimated wheel loads of
       travelling and parked vehicles;
   2. provide for the safe passage of
       vehicles, pedestrians, cyclists,
       and discharge of stormwater run-
       off from contributing catchments
       and the preservation of all-
       weather access;
3. kerb and channel—
   1. controls vehicle movement by
       delineating the carriageway for all
       users;
   2. conveys road pavement run-off to
       stormwater drainage in a manner
       that allows the road to be
       trafficable in 1%AEP local rainfall
       events; and
4. verges and footpaths provide—
   1. safe access for pedestrians and
       cyclists clear of obstructions;
   2. an access area for vehicles onto
       properties;
   3. a corridor allocated for services
       and utilities; and
   4. additional amenity for minor
       roads.




www.bmctraffic.com.au                                                                21
BMC22089: 59 Kabi Road, Cootharaba
8 August 2022
Log in to download the original file

Att5 - Traffic Impact Report.pdf · 2.5 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.