Original source · versioned page text
Att5 - Traffic Impact Report
Design Response
Performance outcomes Acceptable Outcomes
1. are durable enough to carry
estimated wheel loads of
travelling and parked vehicles;
2. provide for the safe passage of
vehicles, pedestrians, cyclists,
and discharge of stormwater run-
off from contributing catchments
and the preservation of all-
weather access;
3. kerb and channel—
1. controls vehicle movement by
delineating the carriageway for all
users;
2. conveys road pavement run-off to
stormwater drainage in a manner
that allows the road to be
trafficable in 1%AEP local rainfall
events; and
4. verges and footpaths provide—
1. safe access for pedestrians and
cyclists clear of obstructions;
2. an access area for vehicles onto
properties;
3. a corridor allocated for services
and utilities; and
4. additional amenity for minor
roads.
www.bmctraffic.com.au 21
BMC22089: 59 Kabi Road, Cootharaba
8 August 2022
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.