7.0 Bushfire Protection Measures in Combination
"
Figure 13. Bushfire Planning Measures in Combination (Source: NSW RFS, 2006)
Figure 13, taken from Planning for Bushfire Protection (NSW Rural Fire Service, 2006) illustrates that there
are other factors and measures which need to be integrated to mutually support one another to provide
protection against bushfire.
Simply removing the hazard (bushland)is one possible way of removing risk to life and property, but this
approach is hardly desirable. The safety of life and property can be achieved whilst retaining the natural
amenity and value of bushland areas, provided these integrated bushfire protection measures are applied.
7.1 Building Construction and Design
Although not required under the BCA, construction of new buildings to the standard that would be required
of a Class 1, 2 or 3 building will reduce the likelihood of building loss to bushfire, and hence allow the
building and school to resume normal functionality immediately after bush fire.
Because of the limited setback available, if AS3959-2009 was to be applied to these (Class 9b) buildings, the
exposed faces of the:
. Knowledge building would require BAL 40 construction on its exposed eastern face and BAL
29 on shielded faces.
. Retreat and Create buildings would require BAL 29 construction on exposed faces and BAL
19 on shielded faces.
. Amenity building would require BAL 19 construction on exposed faces.
. Other buildings would require BAL 12.5 construction.
. (the shielded faces of buildings would be constructed to one BAL level lower, with the
exception of BAL 12.5 buildings, the whole of which should be constructed to BAL 12.5).
Report compiled by Bushfire Risk Reducers for Fulton Trotter Architects, April 2013 Page 20
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Development Application Part 2 of 2 - Application Plans, Bushfire Management Plan and Fire and Evac Plan - OPW13/0463Related documentApplication case desk ↗
About this file
- File size
- 76.1 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.