7.0      Bushfire Protection Measures in Combination




   "




Figure 13. Bushfire Planning Measures in Combination (Source: NSW RFS, 2006)


Figure 13, taken from Planning for Bushfire Protection (NSW Rural Fire Service, 2006) illustrates that there
are other factors and measures which   need to be integrated to mutually support one another to provide

protection against bushfire.


Simply removing the hazard (bushland)is one possible way of removing risk to life and property, but this
approach is hardly desirable. The safety of life and property can be achieved whilst retaining the natural
amenity and value of bushland areas, provided these integrated bushfire protection measures are applied.



7.1       Building Construction and Design

Although not required under the BCA, construction of new buildings to the standard that would be required
of a Class 1, 2 or 3 building will reduce the likelihood of building loss to bushfire, and hence allow the
building and school to resume normal functionality immediately after bush fire.

Because of the limited setback available, if AS3959-2009 was to be applied to these (Class 9b) buildings, the

exposed faces of the:

              .    Knowledge building would require BAL 40 construction on its exposed eastern face and BAL
                   29 on shielded faces.

              .    Retreat and Create buildings would require BAL 29 construction on exposed faces and BAL
                   19 on shielded faces.
              .    Amenity building would require BAL 19 construction on exposed faces.
              .    Other buildings would require BAL 12.5 construction.
              .    (the shielded faces of buildings would be constructed to one BAL level lower, with the
                   exception of BAL 12.5 buildings, the whole of which should be constructed to BAL 12.5).


Report compiled by Bushfire Risk Reducers for Fulton Trotter Architects, April 2013        Page 20

Used in these records

About this file

File size
76.1 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Development Application Part 2 of 2 - Application Plans, Bushfire Management Plan and Fire and Evac Plan - OPW13_0463.pdf · 76.1 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.