Council archive · source document
23616 DA - Change a Development Approval [As Published] · 132003.221132.4
102. Alterations to lot sizes, number of lots and layout may be required following the issue of a Development Permit for Operational Works in respect of the internal roadworks design. Bikeways/Pedestrian Paths 103. The developer will construct a bikeway link from the existing path already servicing the Noosa Primary School to the bicycle storage facilities to be included in the proposed secondary school. This bikeway shall be constructed to the satisfaction of Council. 104. The developer will construct a path along the Beckmans Road frontage of existing Lot 7. The Beckmans Road and new road bikeways should be constructed as indicated on Eppell Olsen & Partners Drawing No 3966-003 Issue A dated October 2002. The bikeway on the Beckmans Road frontage may need to be aligned within the open space area but any alignment would require vegetation retention. 105. The developer will construct a pedestrian/bikeway linkage in the vicinity of proposed Lot 112 to the northern end of Swanbourne Way in the form of a path and timber bridge 2 metres wide. 106. Internally (that is the area of the development north of Plan 3866-003) the bikeway network should be as indicated on Plan 6812-39 by PMM Group dated 13/02/03. The pedestrian and bikeway paths indicated in the open space on the plan will need to have their alignment and need agreed to in the Open Space Management Pian. 107. The developer will also construct a bikeway within the site that allows connection to the new road linkage, through the parcel to the east, to Swanboume Way required by this permit. 108. The developer will be required to pay a contribution towards the construction of the bikeway link to the Lake Entrance Boulevard Network. The amount of the contribution shall be $200 per additional lot adjusted for changes to CPI since September 2000. Sewer 109. A Sewerage Reticulation Master Plan is to be submitted for Council approval prior to the issue of any further permits. 110. Design for a sewerage system to connect all new lots within the site to Council's existing sewerage reticulation system shall be to the standards and requirements set out in Council's Engineering Design Standards. If the design requires the construction of a pump station and a rising main, the connection point to Council's existing system will be nominated by the Manager —Land Development. 111. Detailed design drawing and calculations shall be submitted with an application for a Development Permit for Operational Works in respect of water or sewer works. To avoid conflict with other underground pipes or services, all existing and proposed services required by the development shall be shown on the plans. 112. All connections to sewer system shall be carried out either by Council or by a Council approved Contractor and at no cost to Council. Any connection to a water main shall be undertaken by Council. Water 113. AWater Supply Master Plan is to be submitted for Council approval prior to the issue of any further permits. -21-
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
23616 DA - Change a Development Approval [As Published]Related documentApplication case desk ↗
About this file
- File size
- 4.4 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.