Skip to the record
The definitive source for everything Noosa Council.

Council archive · source document

23616 DA - Change a Development Approval [As Published] · 132003.221132.4

of 94

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

114.

115.

116.

117.

118.

119.

120.

121.

122.

123.

124.

125.

Each water connection to the water reticulation system shall extend to the property
boundary and be metered. All fees for the supply of water meters shall be paid to the
Council.

An application for Development Permit for Operational Works for services shall be
obtained prior to commencement of works.

A reticulated water supply system shall be provided to connect to Council's existing
systems, including a metered water connection to the property boundary or each
Proposed new lot within the site.

Fire hydrants are to be provided throughout the development in accordance with
Council and Queensland Fire Service standards.

Provision shall to be made in all parks locations for a water connection and should
conform to the recommendations of the Bushfire management Plans. Under road
service conduits shall be provided to ensure a connection is available.

Power, Telecommunications and Street Lighting

Any alterations of a public utility of other facility necessitated by the development of the
land or associated construction works either internal or external to the site shall be at
no cost to Council.

All lots to be connected to underground power and telecommunications.
An underground electricity service shall be provided to each lot if not already provided.

in this regard an approved ENERGEX Electrical Design Consultant shall work in
conjunction with Councils Manager — Works Support to prepare detailed designs of the
electrical proposal.

The detailed designs shall then be submitted to ENERGEX for approval and a copy of
their approval submitted to Council in conjunction with a “Certificate of Electricity
Supply for Proposed Subdivisions” (prepared by an approved ENERGEX Electrical
Design consultant) prior to Council endorsing the Plan of Survey.

Any agreement with ENERGEX or an approved ENERGEX Electrical Design
Consultant shall be wholly at the applicant's expense and shall not entail a financial
encumbrance on future purchasers of the proposed lots.

Street lighting and pathway lighting throughout the subdivision shail be provided in
accordance with council’s Engineering Design Standards, section 11.3.3 and to the
satisfaction of Council.

The requirements for TELECOMMUNICATION services shall be satisfied in relation to
any existing services that currently traverse the site and for the provision of new
telephone services to the proposed lots. In this regard written confirmation from an
approved telecommunication agency shall be submitted to the Council prior to Council
endorsing the Plan or Survey.

Engineering Works Designs

A Suitably qualified Registered Professional Engineer, specialising in hydraulics shall
prepare engineering drawings and specifications for stormwater designs and shall be
submitted in conjunction with an application for a Development Permit for Operational
Works.

Alt designs for engineering works involving the construction of pavements, kerb and
channel, vehicular access, footpaths, turnouts, stormwater drainage, water supply or

-22-

Used in these records

About this file

File size
4.4 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

23616 DA - Change a Development Approval [As Published].pdf · 4.4 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.