Council archive · source document
23616 DA - Change a Development Approval [As Published] · 132003.221132.4
126. 127. 128. 129. 130. 131. sewerage reticulation shall be prepared generally in accordance with the requirements of Council’s Engineering Design Standards, shall reference where applicable to Council's Standard Drawings and shall incorporate best engineering practice. A Suitably qualified Registered Professional Engineer shail prepare engineering drawings and specifications for all engineering works, which shall be submitted in conjunction with an application for a Development Permit for Operational Works. Prior to Council endorsing a Plan of Survey, a certificate from a registered Professional Civil Engineer shail be submitted to Council for each Development Permit for Operational Works issued pursuant to this permit. The engineer shall certify that he has supervised those works and that they have been completed in a workman like manner in accordance with that permit. As constructed drawings certified by a registered surveyor showing the extent and finished levels of the filling works are to be submitted for Council's records. These drawings must fully detail levels for all engineering works including water supply and sewer reticulation, drainage structures, building floor levels, finished ground levels, effluent trenches and pavement surface levels. Drawings shall be on transparencies, a hard copy highlighting any changes from design and in electronic format on an IBM PC compatible floppy disk in a format capable of integration with Council's computer system. Approval of works shall not be granted until as constructed drawings have been supplied. General The following steps shall be undertaken prior to commencement of any construction:- 129.1 The Principal Contractor shall give Council's Inspector seven (7) days notice of intention to commence works. 129.2 The Principal Contractor or any of his subcontractors shall not undertake any works unless each contractor has public liability insurance in the sum of $10,000,000 and copies of current public liability insurance policies are submitted to Council's Inspector. 129.3 The Principal Contractor shall nominate a site representative and give a telephone number that can reach the site representative at any time during a 24- hour day. 129.4 The site representative shall arrange to meet on-site with Council's Inspector to obtain Council's requirements for construction of access. 129.5 All signage, including that for safety during construction, shall be in accordance wit the Manual of Uniform Traffic Control Devices and Department of Transport (Main Roads division) Roadworks Signing Guide. Prior to excavating any material to be used for fill on this site, a Development Permit for Operational Works shail have been obtained for the site from which the excavated material is taken. A soil report shall be submitted with the application certifying that the material is free of acid sulphate soils and other deleterious materials. The transportation of all materials to and from the site shall be undertaken in a manner such that no particulate matter escapes onto a public road. All vehicles carrying materials either to or from the site shall be covered to prevent materials including dust being windblown from the vehicle. =23-
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
23616 DA - Change a Development Approval [As Published]Related documentApplication case desk ↗
About this file
- File size
- 4.4 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.