Council archive · source document
23616 DA - Change a Development Approval [As Published] · 132003.221132.4
132. 133. 131. 132. 133. 134. A program of works is to be submitted with any application for any Development Permit for Operational W orks detailing the construction schedule and proposed environmental protection measures. Where the program is changed for any reason whatsoever, a copy of the revised program shall be submitted to Council's Works Inspector within seven (7) days. For the following classes of work associated with development, a Development Permit for Operational W orks must be obtained prior to commencement of works relating to that class of work. The application may combine any or all of these classes of work:- 133.1 Site Civil Works 133.2 Roadworks 133.3 Stormwater Drainage 133.4 Frontage works 133.5 Sewer reticulation including new mains, relocations, diversions, pump stations and rising mains 133.6 Water reticulation 133.7 Site Filling 133.8 Excavation of materials to fill another site 133.9 Landscaping. Operational works shall be carried out in a manner that prevents :- 131.1.Pollution of a waterway 131.2.Dust/sand nuisance to residents in the vicinity 131.3, Transfer of dirt and debris onto a public road 131.4,Excessive notice (less that 1.5 Dba above ambient measured at the lot boundaries) 131.5.Excessive traffic delays (less than 5 minute delays) 131.6. Diminution of neighbourhood amenity (long term parking of employees vehicles, parking of construction equipment etc.) A traffic management plan shall be submitted in conjunction with a Development Permit for Operational Works involving road or drainage works. The plan shall address all phases of construction to be undertaken on site. Where operational works are likely to effect nearby residents and the Noosa Primary School, at least 3 days notice of commencement of work, the name of the site supervisor and a 24 hour contact telephone number shalt be distributed to affected results. Earthworks shall be generally contained within existing and proposed road reserves. Where earthworks are required for the provision of services, existing contours shall be restored. -24-
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
23616 DA - Change a Development Approval [As Published]Related documentApplication case desk ↗
About this file
- File size
- 4.4 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.