Council archive · source document
23616 DA - Change a Development Approval [As Published] · 132003.221132.4
135. Fill imported to the site may only be from a site licences with The Environmental Protection Agency or from a site for which a Development Permit for Operational Works has been issued approving the export of fill. 136. A registered practising Geotechnical Engineer shall test the existing ground conditions for suitability of placing additional fill, prior to such fill being placed. Filling works shall be restricted to the development area itself, and the finished fill levels are to taper to the existing levels prior to the rear boundary of the development area. Batters shall be at a maximum grade of 1:4 unless retained by a wall. Any existing fill or natural materials on the site or with the extent of approved works to the site which do not satisfy the manager — Land Developments or a geotechnical Engineer's requirements shall be removed and replaced with suitable material. 137. Fill shall be compacted to 95% relative dry density as per Main Roads Department Test No. Q8A. A registered practising Geotechnical Engineer shall supervise all the placement of fill and shall certify that all lots have been compacted to the required standard. Any existing fill on the site that does not comply with Council's requirements shall be removed at the direction of the Manager — Land Development prior to additional filling works commencing. 138. Following completion of the filling works and prior to endorsement of the Plan of Survey, the registered practicing Geotechnical Engineer supervising the works shall submit compaction tests across the entire filled areas and a site classification shail be shown on a metes and bounds survey plan. An appropriate property notation shall be placed on Council's rates records to advise prospective purchasers of lots that have been filled that special foundations requirements will apply. 139. Stormwater is to be disposed of on site so as to cause no scour or damage to adjoining properties to the reasonable satisfaction of the Manager —- Land Development. A Development Permit for Building Works shall not be granted until a Development Permit for Operational Works has been issued in regard to the drainage scheme. 140. The stormwater discharge from the site shall be designed such that there is no net increase in the rate of discharge as a result of the development for storm events up to 100 year ARI. 141. Tabulated hydrologic and hydraulic calculations that demonstrate the adequacy or otherwise of the existing site stormwater drainage system shall be submitted in conjunction with a Development Permit for Operational Works. Such calculations shail include any remedial measures necessary to rectify defects in the existing system. Where proposed site damage is to be connected to the existing system the calculations shall clearly demonstrate the adequacy of the existing drainage network to accept the additional stormwater flows. 142. Stormwater drainage shall include measures to protect proposed allotments from run- off from or to surrounding land. The design shall also address controls for gross pollutants, nutrient runoff, oil and grease, and salt and sediment. Underground stormwater shall be designed in accordable with Noosa Council Engineering Design Standards, and shall be connected, where possible to Council's existing drainage systems. An easement of minimum width 4.0 metres shail be granted in favour of Council over any stormwater pipes that traverse private property. -25-
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
23616 DA - Change a Development Approval [As Published]Related documentApplication case desk ↗
About this file
- File size
- 4.4 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.