Council archive · source document
23616 DA - Change a Development Approval [As Published] · 132003.221132.4
24, 25. 26. 27. 28. 29. 30. conjunction with a Development Permit for Operational Works. Such calculations shall include any remedial measures necessary to rectify the defects in the existing system. Where proposed site drainage is to be connected to the existing system, the calculations shalt clearly demonstrate the adequacy of the existing drainage network to accept the additional stormwater flows. The design plans detailing surface levels, which shall be controlled across the site of the development to create a major storm event overland flow path system to cater for the 1:100 year design storm, shall be submitted in conjunction with a Development Permit for Operational Works. Any overland flow from external catchments shall be accepted and incorporated in the major event surface flow drainage system through the site. Overland flows shail be discharged in a safe manner and the product of velocity time depth shall not exceed 0.4m?/sec. The design plans are to show how stormwater runoff within and from the site is to be controlled both during construction and permanently. The plans are to indicate measures to be taken to prevent erosion and the export of sediment from the site and will embrace the principles set out in the Institution of Engineers Australia Engineering Guidelines for Queensland Soil Erosion and Sediment Control, June 1996. Designs shall also incorporate the principle of “no net increase" in nutrients and other pollutants from the developed site. This may require the provision of a drainage system that allows first flush (first 12mm of rainfall) to be collected and treated prior to release into the downstream drainage system. All site drainage shall be by means of gravity systems. A minimum floor level freeboard of 0.5m shall be provided for habitable and storage areas above the top water level of the stormwater overland flows. The following steps shall be undertaken prior to commencement of any construction:- 28.1 The Principat Contractor shall given Council's Inspector seven (7) days' notice of intention to commencement works. 28.2 The Principal Contractor or any of his subcontractors shall not undertake any works unless each contractor has public liability in the sum of $10,000,000 and copies of current public liability insurance policies are submitted to Council's inspector. 28.3 The Principal Contractor shall nominate a site representative and give a telephone number that can reach the site representative at any time during a 24- hour day. 28.4 The site representative shall arrange to meet on-site with Council's inspector to obtain Council's requirements for construction access. 28.5 All signage, including that for safety during construction, shall be in accordance with the Manual of Uniform Traffic Control Devices and Department of Transport (Main Roads Division) Roadworks Signing Guide. Prior to excavating any material to be used for fill on this site, a Development Permit for Operational Works shall have been obtained for the site from which the excavated material is taken. A soil report shall be submitted with the application certifying that the material is free of acid sulphate soils and other deleterious materials. The transportation of all materials to and from the site shall be undertaken in a manner such that no particulate matter scapes onto a public road. All vehicles carrying -31-
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
23616 DA - Change a Development Approval [As Published]Related documentApplication case desk ↗
About this file
- File size
- 4.4 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.