23616 DA - Change a Development Approval [As Published] · 132003.221132.4

of 94

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

materials either to or from the site shall be covered to prevent materials including dust
being windblown from the vehicle.

31. A programme of works is to be submitted with any application for any Development
Permit for Operational Works detailing the construction schedule and proposed
environmental protection measures.

Where the program is changed for any reason whatsoever, a copy of the revised
Program shail be submitted to Council's Works inspector within seven (7) days.

32. Operational Works shall be carried out in a manner that prevents:-

32.1. Pollution of a waterway
32.2. Dust/sand nuisance to residents in the vicinity
32.3. Transfer of dirt and debris onto a public road

32.4. Excessive noise (less than 1.5 Oba above ambient measured at the lot
boundaries)

32.5. Excessive traffic delays (less than 5 minute delays)

32.6. Diminution of neighbourhood amenity (long term parking of employees vehicles,
Parking of construction equipment etc.)

33, A traffic management plan shall be submitted in conjunction with a Development Permit
for Operational Works involving road or drainage works.

34. Where operational works are likely to affect nearby residents or the Primary School, at
least 3 days notice of commencement of work, the name of the site supervisor, and a
24 hour contact telephone number shall be distributed to affected residents.

35. Prior to Council endorsing a Plan of Survey, a certificate from a registered Professional
Civil Engineer shall be submitted to Council for each Development Permit for
Operational Works issued pursuant to this permit. The engineer shall certify that he has
supervised those works and that they have been completed in a workman like manner
in accordance with good engineering practice and in accordance with that permit.

36. As constructed drawings certified by a registered surveyor showing the extent and
finished levels of the filling works are to be submitted for Council's records.

These drawings must fully detail levels for all engineering works including water supply
and sewer reticulation, drainage structures, building floor levels, finished ground levels
effluent trenches and pavement surface levels. Drawings shall be on transparencies, a
hard copy highlighting any changes from design and in electronic format on an IBM PC
compatible floppy disk in a format capable of integration with Council's computer
system.

Approvai of works shall not be granted until as constructed drawings have been
supplied.

Roads

37. The new access road to the lots shall be constructed to the standards and
requirements of Council from the Beckmans Road intersection. These works will
include any necessary upgrade of the intersection.

-32-

Used in these records

About this file

File size
4.4 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

23616 DA - Change a Development Approval [As Published].pdf · 4.4 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.