Council archive · source document
23616 DA - Change a Development Approval [As Published] · 132003.221132.4
38. 39. 40. Where kerb and channel is constructed at a road intersection or any other place providing access to a disabled area, a disabled access ramp to Council’s standard drawing shall be incorporated. The developer will also be required to undertake the necessary modifications to the existing school’s access and car parking in accordance with Eppell Olsen and Partners Drawing No. 3866-003 issue A dated October 2002. The developer will have to construct the new road on an alignment that allows the school access to be constructed in accordance with this plan and will also construct the modified car park and access at the existing school. Discussion is to be held with Queensland Education about detailed design and programming of construction. The foliowing frontage works on the new road shall be constructed:- 40.1. Construction of new kerb and channel; 40.2. Vehicular access to each lot; 40.3. Bitumen pavement widening where required; 40.4. Associated stormwater drainage, generally in accordance with WBM's Report of 2/12/02 and as subsequently modified in their letter to Council of 14/11/02; 40.5. New stormwater management to correct the current problem of stormwater discharge from the road reserve to the Noosa Primary School; 40.6. Hot mix correction to existing pavement as required; 40.7. Aconcrete footpath. The developer is advised to contact Council to obtain the footpath alignment. Footpaths are generally straight/ meandering. 40.8. The remaining footpath area shall be formed, topsoiled and turfed, and planted with trees. A Development Permit for Operational Works shall be obtained prior to undertaking these works. Earthworks 41. 42. 43. Earthworks shall be generally contained within existing and proposed road reserves. Where earthworks are required for the provision of services, existing contours shall be restored. Fill imported to the site may only be from a site licensed with The Environmental Protection Agency or from a site for which a Development Permit for Operational W orks has been issued approving the export of fill. Fill shall be compacted to 95% relative dry density as per Main Roads Department Test 8A. A registered practicing Geotechnical Engineer shall supervise all the placement of fill and shall certify that all lots have been compacted to the required standard. Any existing fill on the site that does not comply with Council's requirements shall be removed at the direction of the Manager —- Land Development prior to additional filling works commencing. -33-
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
23616 DA - Change a Development Approval [As Published]Related documentApplication case desk ↗
About this file
- File size
- 4.4 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.