23616 DA - Change a Development Approval [As Published] · 132003.221132.4

of 94

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Water and Sewer

44,

45.

46.

47.

48.

49,

50.

51.

52.

53.

The site shall be connected to Council's Water Supply and Sewage reticulation
systems to the Water and Sewage Design Guidelines and the requirements of the
Manager — Land Development, a no cost to Council. Both of the parcels connections
shall be in accordance with approved Master Plans for sewer and Water.

Each water connection to the water reticulation system shall extend to the property
boundary and be metered. All fees for the supply of water meters shall be paid to the
Council.

A Development Permit for Operational Works for services shall be obtained prior to
commencement of works.

A reticulated water supply system shall be provided to connect to Council's existing
systems, including a metered water connection to the property boundary of each
proposed new lot within the site.

Fire hydrants are to be provided throughout the development in accordance with
Council and Queensland Fire Service standards.

Design for a sewage system to connect all new jots within the site to Council’s existing
sewage reticulation system shall be to the standards and requirements set out in
Council's Engineering Design Standards. If the design requires the construction of a
pump station and rising main, the connection point to Council's existing system will be
nominated by the Manager — Land Development.

Detailed design drawings and calculations shall be submitted with an application for a
Development Permit for Operational Works in respect of water or sewer works. To
avoid conflict with other underground pipes or services, all existing and proposed
services required by the development shall be shown on the plans.

All connections to sewer system shall be carried our either by Council or by a Council
approved contractor and at no cost to Council. Any connection to a water main shall be
undertaken by Council.

Conduits and kerb markers shall be installed for all necessary service crossings of
roads to Councils satisfaction. An “As constructed” plan showing the locations of the
conduits shall be submitted to Council prior to acceptance of the works “On
Maintenance”.

Subsoil drains shall be used to ensure pits, manholes or other structures do not dam
trenches.

Management Plans

54.

In accordance with the Preliminary Approval conditions of this decision notice, the
developer will submit the following Management Plans for the area of the works
required by this permit with any application for Operational Works:

o Environmental Management Plan
o Landscape Management Plan
o Sediment and Erosion Control Plan

o Flora and Fauna Management Plan

-34-

Used in these records

About this file

File size
4.4 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

23616 DA - Change a Development Approval [As Published].pdf · 4.4 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.