Council archive · source document
23616 DA - Change a Development Approval [As Published] · 132003.221132.4
55. 56. 87. 58. 59. o Fire Management Plan o Construction Management Plan o Stormwater Management Plan o Water Quality Management Plan o Acid Sulfate Soils Management Plan A Stormwater Management Plan for the site including revegetation and remediation shall be prepared to the reasonable satisfaction of Council and submitted with any operational works. The Stormwater Management Plan shall be generally in accordance with WBM's Report of 2/10/02 and as subsequently modified in their letter to Council of 14/11/02. All suitable native vegetation shall be retained. Details of retained vegetation shall be submitted with any application for a Development Permit for Operational Works. Existing vegetation on the site shall be retained except where removal is required to enable construction of the approved roadworks, and services or as otherwise approved under any Development Permit for Operational Works. Clearing will only be approved in road reserves. Prior to the ‘Pre Start’ meeting, a site inspection is to be carried out with relevant Council officers, the Principal Contractor's site representative and the Contractor's Supervising Engineer after road centrelines have been established, and before any clearing. This inspection is to define the limits of clearing for this development. Cleared vegetation is to be suitably processed by one of the following methods and removed from the site:- 58.1. Processing through a woodchipper or shredder. The resulting mulch is to be stockpiled loose in heaps of less than 1000 cubic metres, less than 2.5 metres high with a minimum of 10 metres between edges of heaps. 58.2. Disposal for firewood. 58.3. Disposal for landscaping purposes. 58.4. Transport to alternative site for breaking down materials provided that all necessary permits have been obtained to allow the alternate site to be used for this purpose. This disposal method for clearing works is to be submitted in conjunction with an application for a Development Permit for Operational Work. The Applicant is advised that other methods may be considered provided full details of the method are submitted. The developer is also advised that burning off is an unacceptable method of disposal. Prior to landscaping being accepted on maintenance, a certificate from a qualified landscape architect or qualified horticultultural shall be submitted certifying that the landscaping works required by this permit have been carried out in accordance with the -35-
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
23616 DA - Change a Development Approval [As Published]Related documentApplication case desk ↗
About this file
- File size
- 4.4 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.