23616 DA - Change a Development Approval [As Published] · 132003.221132.4

of 94

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

55.

56.

87.

58.

59.

o Fire Management Plan

o Construction Management Plan
o Stormwater Management Plan

o Water Quality Management Plan

o Acid Sulfate Soils Management Plan

A Stormwater Management Plan for the site including revegetation and remediation
shall be prepared to the reasonable satisfaction of Council and submitted with any
operational works. The Stormwater Management Plan shall be generally in accordance
with WBM's Report of 2/10/02 and as subsequently modified in their letter to Council of
14/11/02.

All suitable native vegetation shall be retained. Details of retained vegetation shall be
submitted with any application for a Development Permit for Operational Works.

Existing vegetation on the site shall be retained except where removal is required to
enable construction of the approved roadworks, and services or as otherwise approved
under any Development Permit for Operational Works. Clearing will only be approved
in road reserves.

Prior to the ‘Pre Start’ meeting, a site inspection is to be carried out with relevant
Council officers, the Principal Contractor's site representative and the Contractor's
Supervising Engineer after road centrelines have been established, and before any
clearing.

This inspection is to define the limits of clearing for this development.

Cleared vegetation is to be suitably processed by one of the following methods and
removed from the site:-

58.1. Processing through a woodchipper or shredder. The resulting mulch is to be
stockpiled loose in heaps of less than 1000 cubic metres, less than 2.5 metres
high with a minimum of 10 metres between edges of heaps.

58.2. Disposal for firewood.

58.3. Disposal for landscaping purposes.

58.4. Transport to alternative site for breaking down materials provided that all
necessary permits have been obtained to allow the alternate site to be used for
this purpose.

This disposal method for clearing works is to be submitted in conjunction with an

application for a Development Permit for Operational Work. The Applicant is advised

that other methods may be considered provided full details of the method are
submitted.

The developer is also advised that burning off is an unacceptable method of disposal.

Prior to landscaping being accepted on maintenance, a certificate from a qualified

landscape architect or qualified horticultultural shall be submitted certifying that the
landscaping works required by this permit have been carried out in accordance with the

-35-

Used in these records

About this file

File size
4.4 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

23616 DA - Change a Development Approval [As Published].pdf · 4.4 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.