Appendix F - engineering report

Attached to the e-mail MCU15/0111 & REC15/0031 Development Application F - Engineering report Email 7 of 8.

of 44

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

                                                                                                      CALIBRE CONSULTING




 14.147 Road and drainage design
 and construction.
 Specific Outcomes                       Probable Solutions                         Proposed Measures
                                         (if code assessable)
 (b)   protect and maintain wildlife     S10.2 Roads avoid native vegetation
       corridor movements and the        and provide for fauna underpasses
       safety of native fauna;           and     associated   fencing where
 (c)   minimise changes to the           appropriate;
       hydrological regime, including    AND
       drainage patterns, runoff and
       water quality;                    S10.3 Road infrastructure within or
 (d)   avoid crossing watercourses,      adjacent to native habitat incorporates
       drainage lines and wetlands,      fences which allow for protected
       but where such crossings are      wildlife movement and controls
       unavoidable, disturbed areas      unrestricted access of domestic cats
       are reinstated and revegetated    and dogs;
       on completion of works; and       AND
 (e)   minimise bulk earthworks.
                                         S10.4 Native vegetation is protected
                                         from clearing or construction activities
                                         by:
                                             (a)      clearly           marking
                                                      vegetation to be retained
                                                      with flagging tape;
                                             (b)      installing      protective
                                                      fencing     around      the
                                                      dripline of vegetation;
                                                      and
                                             (c)      ensuring stock piling,
                                                      storage and vehicle
                                                      parking occur outside
                                                      the areas of vegetation
                                                      to be retained;
                                         AND




                                         S10.5 Low impact construction              See Above
                                         techniques are used around areas of
                                         vegetation to be retained to minimise
                                         interference with the vegetation.


 O11                                     S11
 Roads and stormwater drainage           No solution provided.                      Constructed road and drainage
 infrastructure is proven to be                                                     infrastructure will satisfy Council’s
 suitable for its use prior to Council                                              requirements prior to hand over.
 accepting the dedicated asset.

 O12                                     S12
 Alignment of stormwater drainage        The location, design and construction      Infrastructure will be located for ease
 infrastructure is to allow for easy     of stormwater drainage structures is in    of maintenance, easements will be
 access      for     the    ongoing      accordance with Sections 4 and 5 of        established where required.
 maintenance by Council.                 PSP5, Engineering Design Standards
                                         – Roads, Drainage and Earthworks;
                                         AND




B14158.W | COOROY RETIREMENT COMMUNITY | PALM LAKE RESORTS                                    CIVIL ENGINEERING REPORT | 20
Log in to download the original file

Appendix F - engineering report.pdf · 8.5 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.