Skip to the record
Accept no substitutions.

Original source · versioned page text

Appendix F - engineering report

Attached to the e-mail MCU15/0111 & REC15/0031 Development Application F - Engineering report Email 7 of 8.

of 44

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

                                                                                                        CALIBRE CONSULTING




 14.147 Road and drainage design
 and construction.
 Specific Outcomes                       Probable Solutions                           Proposed Measures
                                         (if code assessable)
                                         S10.2 Where infrastructure is located
                                         on private land an easement is
                                         dedicated over the infrastructure in
                                         accordance with Section 4 of PSP5
                                         Engineering Design Standards –
                                         Roads, Drainage and Earthworks.
 14.148 Frontage Works

 O11 Development is provided with        S11.1 The following infrastructure           All necessary frontage works will be
 external roadworks along the full       components already existing at the           constructed and will consider all
 extent of the frontage of the site to   frontage of the site or are provided at      necessary associated infrastructure.
 an appropriate standard having          the developer’s expense:
 regard to the specified function of     (a) full width sealed road;
 the road.                               (b) concrete kerb and channel where
                                               appropriate;
                                         (c) forming and grading to footpaths;
                                         (d) vehicular kerb and footpath
                                               crossings;
                                         (e) a constructed bikeway;
                                         (f) a constructed footpath;
                                         (g) a constructed carriageway;
                                         (h) required alterations to public
                                               utility    mains,    services     or
                                               installations;
                                         (i) construction of any required
                                               alterations to public utility mains,
                                               services or installations;
                                         (j) stormwater drainage works; and
                                         (k) installation of electrical conduits.
                                         AND
                                         S11.2 Road and drainage design and
                                         construction is in accordance with
                                         Sections 3 and 4 of PSP 5 Engineering
                                         Design Standards – Roads, Drainage
                                         and Earthworks.


 Specific Outcomes                       Probable Solutions                           Proposed Measures
                                         (if code assessable)
 14.149 Road and Rail Corridors

 O12                                     S12.1
  Noise sensitive uses including         Noise sensitive uses including               An acoustic assessment has been
 residential uses are not subjected      residential uses are separated by a          undertaken in relation to this criteria.
 to high traffic noise levels from the   minimum of:                                  Please refer to associated report from
 major road network or rail corridors.        (a)      40m from the property          ASK Consulting Engineers.
                                                       boundary of roads within
                                                       the major road network;
                                                       and
                                              (b)      80m from the property
                                                       boundary      of     rail
                                                       corridors.
                                         OR




B14158.W | COOROY RETIREMENT COMMUNITY | PALM LAKE RESORTS                                      CIVIL ENGINEERING REPORT | 21
Log in to download the original file

Appendix F - engineering report.pdf · 8.5 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.