Skip to the record
Accept no imitations.

Original source · versioned page text

Appendix F - engineering report

Attached to the e-mail MCU15/0111 & REC15/0031 Development Application F - Engineering report Email 7 of 8.

of 44

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

                                                                                                       CALIBRE CONSULTING




 Specific Outcomes                       Probable Solutions                          Proposed Measures
                                         (if code assessable)
                                         S12.2 Development in the vicinity of
                                         road corridors meets the following
                                         external design criteria for roads in the
                                         major road network:
                                         (a) 63dB(A)L10(18 hours) based on
                                               predicted traffic volumes ten
                                               years hence;
                                         AND
                                         S12.3 Development in the vicinity of
                                         rail corridors meets the following
                                         external design level noise criteria:
                                         (a) 65dB(a), assessed as the 24
                                              hour      average       equivalent
                                              continuous A-weighted sound
                                              pressure level; and
                                         (b) 87dB(A) assessed as a single
                                              event maximum sound pressure
                                              level.
 14.150 Staged Development

 O15
 Staged development is planned,          No solution provided.                       Staged development is proposed and
 designed and constructed to ensure                                                  due consideration for required services
 that:                                                                               will be allowed for.
 (a) each stage of the development
       can be constructed without
       interruption to services and
       utilities provided to the
       previous stages;
 (b) the infrastructure provided is
       capable of servicing the entire
       development; and
 (c) the       materials  used    are
       consistent throughout the
       development.
 14.151 Alterations to Services and
 Utilities
 O16                                     S16.1
 Any alteration or repairs to            Any      alteration or repair   to          Any change to existing infrastructure
 infrastructure as a result of the       infrastructure as a result of the           will be rectified at the expense of the
 development are made at no cost to      development are completed at the            developer.
 Council.                                developer’s expense.




B14158.W | COOROY RETIREMENT COMMUNITY | PALM LAKE RESORTS                                     CIVIL ENGINEERING REPORT | 22
Log in to download the original file

Appendix F - engineering report.pdf · 8.5 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.