Appendix F - engineering report
Attached to the e-mail MCU15/0111 & REC15/0031 Development Application F - Engineering report Email 7 of 8.
CALIBRE CONSULTING
Table 7-6: Division 19: Water Sensitive Design Code
Table 14-61
Specific Outcomes Probable Solutions Proposed Measures
(if code assessable)
Water Reuse
O1 S1.1
Development uses a combination of No solution provided. The development uses a combination
detention and retention systems to of detention and retention. Please refer
capture runoff from areas on the to the Concept Stormwater Quality
site; Report No. B14158.W -01A
undertaken by Calibre Consulting
AND
dated December 2014.
O2 S2.1 Refer to the Concept Stormwater
Quality Management Report No.
Water storage devices must have No solution provided. B14158.W -01A undertaken by Calibre
sufficient capacity having regard to
Consulting dated December 2014.
local rainfall pattern and the
catchment area of roof or other hard
standing surface.
AND
O3 S3.1
Captured water utilised for all non- Captured water is plumbed to be Refer to the Concept Stormwater
potable uses on site; available for all external uses including
Quality Management Report No.
gardening, irrigation, ponds, filling
AND B14158.W -01A undertaken by
swimming pools and outdoor cleaning,
as well as all ground floor toilet cisterns Calibre Consulting dated December
and washing machine cold taps; and 2014.
S3.2
Where the captured water is used for
toilet flushing and/or laundry use, an
automatic or manual interchange
device that allows alternate use of
capture water or the reticulation water
supply is installed to ensure that there
is a continual supply of water for
sanitary flushing and laundry use.
O4 S4.1
Onsite detention does not adversely No solution provided. Refer to the Concept Stormwater
impact on water requirements Quality Management Report No.
downstream of the site where the B14158.W -01A undertaken by Calibre
water is required to sustain the Consulting dated December 2014.
ecology and hydrology of
downstream systems
(environmental flows);
AND
O5 S5.1
Within the Shire Business Centre No solution provided. N/A
site, as shown on Map SBC, on site
detention measures are contained
B14158.W | COOROY RETIREMENT COMMUNITY | PALM LAKE RESORTS CIVIL ENGINEERING REPORT | 23
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.