Appendix F - engineering report
Attached to the e-mail MCU15/0111 & REC15/0031 Development Application F - Engineering report Email 7 of 8.
CALIBRE CONSULTING
Specific Outcomes Probable Solutions Proposed Measures
(if code assessable)
within the developed areas of the
site, clear of drainage lines and
Open Space precincts.
Run-off Treatment
O6 S6.1
Run-off that leaves the site is No solution provided. Refer to the Concept Stormwater
treated so as not to adversely Quality Management Report No.
impact on the ecology and B14158.W -01A undertaken by Calibre
hydrology of downstream Consulting dated December 2014.
environmental flows; Bioretention Basins, Constructed
Wetlands and Water Quality Control
AND
Ponds have been incorporated into the
treatment train.
O7 S7.1
Within the Shire Business Centre as No solution provided. N/A
shown on Map SBC –
(a) run-off treatment occurs within
the site; and
(b) drainage lines are only used
for final polishing of run-off.
Town Water Supply Connections
O8 Backflow devices or similar S8.1 A suitable backflow prevention Suitable backflow prevention devices
systems ensure water reuse device is installed to protect the will be installed in appropriate
facilities have no impact on the potable water within the reticulation locations of the potable water supply.
quality of the town mains water. water supply in accordance with
AS/NZS 3500:2003 Plumbing and
Drainage.
Use of Natural Treatments and
Systems
O9 Natural treatment strategies, No solution provided We refer you to Brown Consulting
including grass swales and bio- report dated October 2007. We note
retention systems, vegetated that bioretention swales, GPT and
filtration strips and gross pollutant control ponds will be used to treat run-
traps are used where practicable; off.
AND
O10 Within the Shire Business No solution provided. Not Applicable
Centre as shown on Map SBC,
where necessary, drainage lines are
ecologically enhanced to ensure
that the water quality polishing
functions are of high standard.
Table 7-7: Division 20: Water Supply and Sewerage Reticulation Code
Table 14-59 Water Supply
Specific Outcomes Probable Solutions Proposed Measures
(if code assessable)
14.1164 Design and Construction
(Water)
B14158.W | COOROY RETIREMENT COMMUNITY | PALM LAKE RESORTS CIVIL ENGINEERING REPORT | 24
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.