Appendix F - engineering report

Attached to the e-mail MCU15/0111 & REC15/0031 Development Application F - Engineering report Email 7 of 8.

of 44

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

                                                                                                     CALIBRE CONSULTING




 Specific Outcomes                       Probable Solutions                        Proposed Measures
                                         (if code assessable)
 O1 Water Supply Infrastructure          S1.1 Water supply infrastructure is       A water supply analysis has been
                                         designed in accordance with Section       undertaken. The results of the study
 (a)   Meets the needs of the users;
                                         3 of PSP 6 – Engineering Design           indicate that sufficient capacity is
 (b)   Is designed to be compatible      Standards – Water and Sewerage            available for the proposed
       with existing infrastructure;     and As Constructed data submitted in      development.
       and                               accordance with Section 7 of PSP 6 –
                                         Engineering Design Standards –
 (c)   Is deigned using materials        Water and Sewerage.
       that are suitable for the use,
       durable, easy to maintain and
       cost effective, taking into
       account the whole of life cycle
       cost and Council’s
       maintenance inventory.

 O2 Water supply infrastructure is       S2.1 Water supply infrastructure is       All water supply infrastructure will be
 constructed:                            constructed in accordance with            constructed and tested in accordance
                                         Section 6 of PSP 6 – Engineering          with Council requirements.
 (a)   in accordance with
                                         Design Standards – Water and
       appropriate engineering
                                         Sewerage;
       standards; and
                                         AND
 (b)   to minimise adverse
       environmental impacts.

                                         S2.2 Erosion and Sediment control         Erosion and sediment control
                                         measures are designed and                 measures will be prepared as part of
                                         implemented in accordance with the        the operational works (civil) design
                                         Institution of Engineers Australia (Qld   drawings.
                                         Division) Soil Erosion and Sediment
                                         Control – Guidelines for Queensland
                                         Construction Sites.

 O3 Water supply infrastructure is       No solution provided.                     Water supply infrastructure will be
 proven to be suitable for its use                                                 constructed and tested to Council’s
 prior to Council accepting the                                                    satisfaction prior to hand over.
 dedicated asset.

 O4 Water supply infrastructure is       No solution provided.                     Water supply infrastructure will be
 provided with all supporting                                                      supported by all required technical
 technical documentation.                                                          documentation.

 O5 Where buildings or other             S5.1 The footing of any building or       All existing infrastructure will be
 structures are in proximity to          structure is located clear of the zone    protected from the proposed works.
 Council’s water supply                  of influence but no closer than 1.5m
 infrastructure, provision is made to    (measured horizontally) from
 protect the infrastructure from         infrastructure including sewers, water
 physical damage and to allow            mains and stormwater structures.
 ongoing maintenance by Council.
                                         AND

                                         S5.2 A registered easement in favour
                                         of Council is created over all
                                         underground infrastructure located in
                                         private property;
                                         AND




B14158.W | COOROY RETIREMENT COMMUNITY | PALM LAKE RESORTS                                   CIVIL ENGINEERING REPORT | 25
Log in to download the original file

Appendix F - engineering report.pdf · 8.5 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.