Appendix F - engineering report
Attached to the e-mail MCU15/0111 & REC15/0031 Development Application F - Engineering report Email 7 of 8.
CALIBRE CONSULTING
Specific Outcomes Probable Solutions Proposed Measures
(if code assessable)
S5.3 The width of the easement is
the greater of 3m or the width of the
zone of influence;
AND
S5.4 The easement is centred over
the centreline of the infrastructure.
O6 Alignment of water supply S6.1 Infrastructure is designed and Detailed design considerations will
infrastructure allows for easy constructed on the preferred ensure ease of maintenance is
access for the ongoing alignments in accordance with achieved.
maintenance by Council. Section 3 of PSP 6 Engineering
Design Standards – Water and
Sewerage.
O7 Any alterations or repairs to S7.1 Any alterations or repairs to Existing infrastructure will be
infrastructure as a result of the infrastructure as a result of the protected at all times. Any changes
development are made at no cost development are completed at the will be rectified at the developer’s
to the Council. developer’s expense. expense.
14.183 Design and Construction
Sewer
O8 Sewerage Reticulation S1.1 Sewerage Reticulation Sewer infrastructure will be designed
Infrastructure infrastructure is designed in to cater for the intended load and will
accordance with Sections 4 and 5 of be compatible with existing
(a) Meets the needs of the users;
PSP 6 – Engineering Design infrastructure.
(b) Is designed to be compatible Standards – Water and Sewerage.
with existing infrastructure;
and
(c) Is designed using materials
that are suitable for the use,
durable, easy to maintain and
cost effective, taking into
account the whole of life cycle
cost and Council’s
maintenance inventory.
O9 Sewerage Reticulation S9.1 Sewerage Reticulation Sewer infrastructure will be designed
infrastructure is constructed: infrastructure is constructed in in accordance with Council
accordance with Section 6 of PSP 6 – requirements and general engineering
(a) in accordance with
Engineering Design Standards – principles.
appropriate engineering
Water and Sewerage and As
standards; and
Constructed data submitted in
(b) to minimise adverse accordance with Section 7 of PSP 6 –
environmental impacts. Engineering Design Standards –
Water and Sewerage;
AND
S9.2 Erosion and Sediment control
measures are designed and
implemented in accordance with the
Institution of Engineers Australia (Qld
Division) Soil Erosion and Sediment
B14158.W | COOROY RETIREMENT COMMUNITY | PALM LAKE RESORTS CIVIL ENGINEERING REPORT | 26
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.