ORDINARY MEETING MINUTES 15 SEPTEMBER 2022
25. Pedestrian and bicycle facilities must be provided for the development. The works
must be undertaken in accordance with an Operational Works approval and must
include in particular:
a. a 2 metre wide footpath along one side of Wimmers Lane and Emerald
Street.
b. the resealing of the existing asphalt path fronting the development.
26. Pedestrian and bicycle facilities must be provided for the development and include:
a. 10 bicycle parking spaces and 5 lockers; and
b. one shower cubicle with ancillary change room.
Stormwater Drainage
27. The site must be provided with a stormwater drainage system connecting to a
lawful point of discharge. The works must be undertaken in accordance with an
Operational Works approval and the Queensland Urban Drainage Manual, and
must include in particular:
a. works generally in accordance with the Stormwater Layout Plan. Fig 1.2
Revision B prepared by Callaghan & Toth dated 6 July 2022;
b. extension of the site stormwater system to accommodate stormwater from
the existing external drainage pipe from Lot 2 on RP44101 to the east; and
c. the use of gravity stormwater drainage and not surcharge pits.
This condition is imposed pursuant to s145 of the Planning Act 2016 being non-
trunk infrastructure.
Services
28. Underground reticulated electricity and telecommunication services must be
provided to each lot in accordance with an approval for Operational Works and the
standards and requirements of the relevant service provider.
29. Unless otherwise stipulated by telecommunications legislation at the time of
construction, the development must be provided with all necessary conduits, pits
and pipes to accommodate the future connection of optic fibre technology
telecommunications.
30. Certification must be submitted to Council from all relevant service providers
(Energex, NBN and Unitywater) which certifies that the development has met the
requirements of this Decision Notice and all applicable legislation at the time of
construction.
Easements
31. A 1.5 metre wide easement for stormwater drainage purposes must be registered
against the title of the property in favour of Lot 2 on RP44101 and be generally in
accordance with the Stormwater Layout Plan. Fig 1.2 Revision B prepared by
Callaghan & Toth dated 6 July 2022. The easement must be of sufficient width to
wholly encompass the drainage infrastructure and extend to the Emerald Street
boundary.
32. A 2.0 metre wide easement for “Public Thoroughfare” purposes must be registered
against the title of the property in favour of Council. The easement must be located
directly adjacent to the eastern property boundary and extend for the full length
between Wimmers Lane and Emerald Street. The easement must be:
a. clearly shown on all plans submitted for Operational Works; and
b. registered prior to the commencement of the use.
Page 15 of 26