                      a.      construction of a pedestrian footpath in accordance with the conditions of this Decision
                              Notice; and
                      b.      removal of the existing property access and reinstatement of the kerb, footpath and
                              verge area to match the balance of the site frontage, including the provision of topsoil
                              and turf where the existing verge is grassed.
                      Condition 25 is imposed pursuant to s145 of the Planning Act 2016 being non-trunk
                      infrastructure.
                      Site Access and Driveways
               26.    A sealed access driveway must be provided from Edward Street to all parking and
                      manoeuvring areas of the development. The works must be undertaken in accordance with
                      an Operational Works approval and must be generally in accordance with:
                      a.      For layout purposes, Drawing number DD2.1 C revision C prepared by Tim Ditchfield
                              Architects dated 8 February 2023;
                      a.      For civil works, Drawing number 32091-OW4.1 revision A prepared by SCG Consulting
                              Engineers dated 30 November 2022;
                      b.      For civil works, Drawing number 32091-OW4.2 revision A prepared by SCG Consulting
                              Engineers dated 30 November 2022;
                      c.      For civil works, Drawing number 32091-OW4.3 revision A prepared by SCG Consulting
                              Engineers dated September 2022.
                      Car Parking
               27.    A minimum of 2 covered car parking spaces and 1 additional car parking space must be
                      provided on the site.
               28.    All car parking spaces and access driveways must be maintained exclusively for vehicle
                      parking and manoeuvring and kept in a tidy and safe condition at all times.
                      Pedestrian and Bicycle Facilities
               29.    Pedestrian and bicycle facilities must be provided for the development. The works must be
                      undertaken in accordance with an Operational Works approval and must include in particular
                      a 1.2 metre wide footpath within the road verge for the entire length of the site’s frontage to
                      Edward Street
                      Condition 29 is imposed pursuant to s145 of the Planning Act 2016 being non-trunk
                      infrastructure.
                      Stormwater Drainage
               30.    The site must be provided with a stormwater drainage system connecting to a lawful point of
                      discharge. The works must be undertaken in accordance with an Operational Works
                      approval and be generally in accordance with drawing number 32091-SW1.1 revision A
                      prepared by SCG Consulting Engineers dated 30 November 2022.
                      Condition 30 is imposed pursuant to s145 of the Planning Act 2016 being non-trunk
                      infrastructure.
                      Services
               31.    Reticulated electricity and telecommunication services must be provided to each dwelling in
                      accordance with the standards and requirements of the relevant service provider.
               32.    Unless otherwise stipulated by telecommunications legislation at the time of construction, the
                      development must be provided with all necessary conduits, pits and pipes to accommodate
                      the future connection of optic fibre technology telecommunications.
               33.    Certification must be submitted to Council from all relevant service providers (Energex, NBN
                      and Unitywater) which certifies that the development has met the requirements of this
                      Decision Notice and all applicable legislation at the time of construction.



                                                                                                        Page 5 of 10
Document Set ID: 22437358
Version: 3, Version Date: 25/05/2023

Used in these records

About this file

File size
176 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Negotiated Decision Notice MCU22 0174.pdf · 176 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.