Negotiated Decision Notice MCU22 0174 · MCU22/0174
a. construction of a pedestrian footpath in accordance with the conditions of this Decision
Notice; and
b. removal of the existing property access and reinstatement of the kerb, footpath and
verge area to match the balance of the site frontage, including the provision of topsoil
and turf where the existing verge is grassed.
Condition 25 is imposed pursuant to s145 of the Planning Act 2016 being non-trunk
infrastructure.
Site Access and Driveways
26. A sealed access driveway must be provided from Edward Street to all parking and
manoeuvring areas of the development. The works must be undertaken in accordance with
an Operational Works approval and must be generally in accordance with:
a. For layout purposes, Drawing number DD2.1 C revision C prepared by Tim Ditchfield
Architects dated 8 February 2023;
a. For civil works, Drawing number 32091-OW4.1 revision A prepared by SCG Consulting
Engineers dated 30 November 2022;
b. For civil works, Drawing number 32091-OW4.2 revision A prepared by SCG Consulting
Engineers dated 30 November 2022;
c. For civil works, Drawing number 32091-OW4.3 revision A prepared by SCG Consulting
Engineers dated September 2022.
Car Parking
27. A minimum of 2 covered car parking spaces and 1 additional car parking space must be
provided on the site.
28. All car parking spaces and access driveways must be maintained exclusively for vehicle
parking and manoeuvring and kept in a tidy and safe condition at all times.
Pedestrian and Bicycle Facilities
29. Pedestrian and bicycle facilities must be provided for the development. The works must be
undertaken in accordance with an Operational Works approval and must include in particular
a 1.2 metre wide footpath within the road verge for the entire length of the site’s frontage to
Edward Street
Condition 29 is imposed pursuant to s145 of the Planning Act 2016 being non-trunk
infrastructure.
Stormwater Drainage
30. The site must be provided with a stormwater drainage system connecting to a lawful point of
discharge. The works must be undertaken in accordance with an Operational Works
approval and be generally in accordance with drawing number 32091-SW1.1 revision A
prepared by SCG Consulting Engineers dated 30 November 2022.
Condition 30 is imposed pursuant to s145 of the Planning Act 2016 being non-trunk
infrastructure.
Services
31. Reticulated electricity and telecommunication services must be provided to each dwelling in
accordance with the standards and requirements of the relevant service provider.
32. Unless otherwise stipulated by telecommunications legislation at the time of construction, the
development must be provided with all necessary conduits, pits and pipes to accommodate
the future connection of optic fibre technology telecommunications.
33. Certification must be submitted to Council from all relevant service providers (Energex, NBN
and Unitywater) which certifies that the development has met the requirements of this
Decision Notice and all applicable legislation at the time of construction.
Page 5 of 10
Document Set ID: 22437358
Version: 3, Version Date: 25/05/2023
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Negotiated Decision Notice MCU22 0174.pdfRelated documentApplication case desk ↗
About this file
- File size
- 176 KB (small file)
- File type
No other editions are linked here.