Council archive · source document
OPW14/0362 Operational Works for reconstruction of stormwater pit
4.9 Is the work for other work for taking or interfering with water? No | End of part 4 of this checklist [-] Yes | + Adevelopment permit is required and this application will be assessed by the chief executive of resources state code in the SDAP e You must complete DAS form 21—Other work in a watercourse e — End of part 4 of this checklist DSDIP as assessment manager or concurrence against the Sustainable management of water Part 5—For particular dams 5.1 Is the proposed operational work for the following? The construction of a dam more than 10 metres in height and having a storage capacity of more than 1500 megalitres LE] Yes No The construction of a dam more than 10 metres in height and having a storage capacity of more than 750 megalitres and a catchment area that is more than three times its maximum surface area at full supply level | Yes No Work carried out in relation to an existing non-referable dam that will result in the dam being more than 10 metres in height and having a storage capacity of more than 1500 megalitres Cl Yes No Work to an existing non-referable dam that will result in the dam being more than 10 metres in height and having a storage capacity of more than 750 megalitres and a catchment area that is more than three times its maximum surface area at full supply level CT Yes &X No Works that involve the increase of capacity of a non-referable dam by more than 10 per cent if the dam is: more than 10 metres in height and having a storage capacity of more than 1500 megalitres, or *® more than 10 metres in height and having a storage capacity of more than 750 megalitres and a catchment area that is more than three times its maximum surface area at full supply level im Yes Xx] No Works carried out in relation to a referable dam if, because of the works, the storage capacity of the dam will increase by more than 10% after the works are carried out. | Yes Xl No Constructing a dam for which the chief executive under the Water Supply (Safety and Reliability) Act 2008 has given a notice to have the dam failure impact assessed. Ol Yes Xx] No « If no to all of the above, the proposed operational work is not required to be failure impact assessed and is therefore not assessable development. This is the end of part 5 of this checklist e — If yes to any of the above, this application requires assessment by the chief executive of DSDIP as assessment manager or concurrence agency against the Particular dams state code in the SDAP. - You must complete /DAS form 16—Particular dams - End of part 5 of this checklist Part 6—Tidal work 6.1 Is the proposed tidal work any of the following: Excluded work Cc] Yes No Work that is self-assessable development under schedule 3, part 2, table 4, item 8 of the Sustainable Planning Regulation 2009 C] Yes No Work carried out in a priority development area Cl Yes No Checklist 4—Operational work Version 4.1—-1 October 2074
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
OPW14/0362 Operational Works for reconstruction of stormwater pitRelated documentApplication case desk ↗
About this file
- File size
- 2.0 MB (small file)
- File type
No other editions are linked here.