Work carried out on premises to which structure plan arrangements apply L] Yes No

 

 

e — If no to all of the above, continue to question 6.2.

e — If yes to any of the above, this aspect of development is not assessable development and a development permit is
not required.

 

6.2 Is any of the proposed tidal work prescribed tidal work?

 

 

[><] No e This application requires assessment by the chief executive of DSDIP as assessment manager or
concurrence against the Tidal works, or development in a coastal management district state code in
the SDAP

« You must complete /DAS form 23—Tidal works and development within coastal management districts
e — End of part 6 of this checklist

 

 

C] Yes e You must complete /DAS form 23—Tidal works and development within coastal management districts

« — This application requires assessment by the local government as assessment manager and the chief
executive of DSDIP will be a concurrence agency for the application; you must refer a copy of the
application to DSDIP

e — End of part 6 of this checklist

 

 

 

Section reference:
e Sustainable Planning Regulation 2009, schedule 3, part 1, table 4, item 5
e Sustainable Planning Regulation 2009, schedule 7, table 2, items 13 to 18

 

Part 7—Coastal management

 

 

7.1. Is the proposed operational work any of the following:

 

 

 

 

 

 

Excluded works . C] Yes No
Work that is self-assessable development under schedule 3, part 2, table 4, item 8 of the C Yes xX No
Sustainable Planning Regulation 2009

Work carried out in a priority development area | Yes Xx No
Work carried out on premises to which structure plan arrangements apply CL Yes No

 

 

 

e If no to all of the above, continue to question 7.2

e If yes to any of the above, this aspect of development is not assessable development and a development permit is
not required. End of part 7 of this checklist.

 

7.2 Is the proposed operational work for any of the following?

 

 

Interfering with quarry material as defined under the Coastal Protection and Management Act LE Yes No
1995 on state coastal land above high-water mark

 

 

Disposing of dredge spoil or other solid waste material in tidal water EL] Yes xX] No
Constructing an artificial waterway Cc Yes No

 

 

Removing or interfering with coastal dunes on land, other than State coastal land, that is in an | Yes No
erosion prone area as defined in the Coastal Protection and Management Act 1995 and above
high-water mark

 

 

 

Checklist 4—Operational work
Version 4.1-~1 October 2014

 

Used in these records

About this file

File size
2.0 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

OPW14_0362 Operational Works for reconstruction of stormwater pit.pdf · 2.0 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.