Council archive · source document
OPW14/0362 Operational Works for reconstruction of stormwater pit
Work carried out on premises to which structure plan arrangements apply L] Yes No e — If no to all of the above, continue to question 6.2. e — If yes to any of the above, this aspect of development is not assessable development and a development permit is not required. 6.2 Is any of the proposed tidal work prescribed tidal work? [><] No e This application requires assessment by the chief executive of DSDIP as assessment manager or concurrence against the Tidal works, or development in a coastal management district state code in the SDAP « You must complete /DAS form 23—Tidal works and development within coastal management districts e — End of part 6 of this checklist C] Yes e You must complete /DAS form 23—Tidal works and development within coastal management districts « — This application requires assessment by the local government as assessment manager and the chief executive of DSDIP will be a concurrence agency for the application; you must refer a copy of the application to DSDIP e — End of part 6 of this checklist Section reference: e Sustainable Planning Regulation 2009, schedule 3, part 1, table 4, item 5 e Sustainable Planning Regulation 2009, schedule 7, table 2, items 13 to 18 Part 7—Coastal management 7.1. Is the proposed operational work any of the following: Excluded works . C] Yes No Work that is self-assessable development under schedule 3, part 2, table 4, item 8 of the C Yes xX No Sustainable Planning Regulation 2009 Work carried out in a priority development area | Yes Xx No Work carried out on premises to which structure plan arrangements apply CL Yes No e If no to all of the above, continue to question 7.2 e If yes to any of the above, this aspect of development is not assessable development and a development permit is not required. End of part 7 of this checklist. 7.2 Is the proposed operational work for any of the following? Interfering with quarry material as defined under the Coastal Protection and Management Act LE Yes No 1995 on state coastal land above high-water mark Disposing of dredge spoil or other solid waste material in tidal water EL] Yes xX] No Constructing an artificial waterway Cc Yes No Removing or interfering with coastal dunes on land, other than State coastal land, that is in an | Yes No erosion prone area as defined in the Coastal Protection and Management Act 1995 and above high-water mark Checklist 4—Operational work Version 4.1-~1 October 2014
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
OPW14/0362 Operational Works for reconstruction of stormwater pitRelated documentApplication case desk ↗
About this file
- File size
- 2.0 MB (small file)
- File type
No other editions are linked here.