Council archive · source document
OPW14/0362 Operational Works for reconstruction of stormwater pit
e — If you answered no to all of the above, a development permit is not required for this aspect of development and that is the end of part 7 of this checklist e — If you answered yes to any of the above, - This application may require assessment by the chief executive of DSDIP as assessment manager or concurrence agency against the Tidal works, or development in a coastal management district state code in the SDAP - You must complete DAS form 23—Tidal works and development within coastal management districts - End of part 7 of this checklist Section reference: e¢ Sustainable Planning Regulation 2009, schedule 3, part 1, table 4, item 5 e Sustainable Planning Regulation 2009, schedule 7, table 2, items 13 to 18 Part 8—Waterway barrier works 8.1 Is the proposed operational work any of the following: Work that is self-assessable development under schedule 3, part 2 of the Sustainable L] Yes No Planning Regulation 2009 Work carried out on premises to which structure plan arrangements apply | Yes Xx] No e = If no to all of the above, - Adevelopment permit is required for this aspect of development. This application requires assessment by the chief executive of DSDIP as assessment manager or concurrence agency against the Constructing or raising waterway barrier works in fish habitats state code in the SDAP - You must complete DAS form 27—Waterway barrier works - End of part 8 of this checklist e If yes to any of the above, this aspect of development is not assessable development and a development permit is not required. End of part 8 of this checklist. Section reference: e Sustainable Planning Regulation 2009, schedule 3, part 1, table 4, item 6 e Sustainable Planning Regulation 2009, schedule 3, part 2 e Sustainable Planning Regulation 2009, schedule 7, table 2, item 29 Part 9—Declared fish habitat area 9.1 Is the operational work reasonably necessary for any of the following? The maintenance of existing structures, including for example the following structures, if the LC Yes kx] No structures were constructed in compliance with all the requirements under any Act relating to a structure of that type: e boat ramps, boardwalks, drains, fences, jetties, roads, safety signs, swimming enclosures and weirs * powerlines or associated powerline infrastructure. Educational or research purposes relating to the declared fish habitat area [] Yes No Monitoring the impact of development on the declared fish habitat area L] Yes [X] No Checklist 4—Operational work Version 4.1—1 October 2014
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
OPW14/0362 Operational Works for reconstruction of stormwater pitRelated documentApplication case desk ↗
About this file
- File size
- 2.0 MB (small file)
- File type
No other editions are linked here.