Skip to the record
Search everything, all in one place.

Council archive · source document

OPW14/0362 Operational Works for reconstruction of stormwater pit

of 27

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

 

 

   

e — If you answered no to all of the above, a development permit is not required for this aspect of development and
that is the end of part 7 of this checklist

e — If you answered yes to any of the above,

- This application may require assessment by the chief executive of DSDIP as assessment manager or
concurrence agency against the Tidal works, or development in a coastal management district state code in
the SDAP

- You must complete DAS form 23—Tidal works and development within coastal management districts
- End of part 7 of this checklist

Section reference:
e¢ Sustainable Planning Regulation 2009, schedule 3, part 1, table 4, item 5
e Sustainable Planning Regulation 2009, schedule 7, table 2, items 13 to 18

 

Part 8—Waterway barrier works

 

 

8.1 Is the proposed operational work any of the following:

 

 

Work that is self-assessable development under schedule 3, part 2 of the Sustainable L] Yes No
Planning Regulation 2009

 

 

 

 

Work carried out on premises to which structure plan arrangements apply | Yes Xx] No

 

e = If no to all of the above,

- Adevelopment permit is required for this aspect of development. This application requires assessment by the
chief executive of DSDIP as assessment manager or concurrence agency against the Constructing or raising
waterway barrier works in fish habitats state code in the SDAP

- You must complete DAS form 27—Waterway barrier works
- End of part 8 of this checklist

e If yes to any of the above, this aspect of development is not assessable development and a development permit is
not required. End of part 8 of this checklist.

Section reference:

e Sustainable Planning Regulation 2009, schedule 3, part 1, table 4, item 6
e Sustainable Planning Regulation 2009, schedule 3, part 2

e Sustainable Planning Regulation 2009, schedule 7, table 2, item 29

 

Part 9—Declared fish habitat area

 

 

9.1 Is the operational work reasonably necessary for any of the following?

 

 

The maintenance of existing structures, including for example the following structures, if the LC Yes kx] No
structures were constructed in compliance with all the requirements under any Act relating to
a structure of that type:

e boat ramps, boardwalks, drains, fences, jetties, roads, safety signs, swimming
enclosures and weirs

* powerlines or associated powerline infrastructure.

 

 

Educational or research purposes relating to the declared fish habitat area [] Yes No
Monitoring the impact of development on the declared fish habitat area L] Yes [X] No

 

 

 

 

Checklist 4—Operational work
Version 4.1—1 October 2014

Used in these records

About this file

File size
2.0 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

OPW14_0362 Operational Works for reconstruction of stormwater pit.pdf · 2.0 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.