Skip to the record
Beware of cheap imitations.

Council archive · source document

OPW14/0362 Operational Works for reconstruction of stormwater pit

of 27

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

 

 

SOOT

 

 

The construction or placement of structures, including for example, safety signs, swimming
enclosures and aids to navigation, if:

e the impact on the area is minor

e the structures are constructed in compliance with all the requirements, under any Act
relating to a structure of that type.

Cc] Yes No

 

 

Public benefit works, including, for example, the construction of runnels for mosquito control,
the removal of Lyngbya and seed collection for site rehabilitation, if the impact on the area is
minor

E] Yes xX No

 

 

« — If yes to any of the above, a permit is not required for this aspect of development but the proposed work must

comply with any applicable self-assessable codes. End of part 9 of this checklist.
e — If no to all of the above:

- Adevelopment permit is required and this application requires assessment by the chief executive of DSDIP
as assessment manager or concurrence agency, against the Development in or adjacent to a declared fish

habitat area state code in the SDAP
- You must complete IDAS form 27—Waterway barrier works
- End of part 9 of this checklist

Section reference:

e Sustainable Planning Regulation 2009, schedule 3, part 1, table 4, item 7
e¢ Sustainable Planning Regulation 2009, schedule 3, part 2, table 4, item 3
e Sustainable Planning Regulation 2009, schedule 7, table 2, item 26

 

Part 10—Removal, destruction or damage of a marine plant

 

 

10.1 Is the proposed operational work any of the following?

 

 

For reconfiguring a lot that is assessable development under table 3, item 1, if there is a
development permit in effect for the reconfiguration

L] Yes No

 

For a material change of use that is assessable development, if there is a development permit
in effect for the change of use

L] Yes No

 

Self-assessable development under schedule 3, part 2 of the Sustainable Planning Regulation
2009

LE] Yes No

 

Carried out in a priority development area

LC] Yes No

 

 

Carried out on premises to which structure plan arrangements apply

C] Yes Xx] No

 

 

 

e If yes to any of the above, this aspect of development is not assessable development and
is required. End of part 10 of this checklist.

e — If no to all of the above, continue to question 10.2

no development permit

 

10.2 Is the proposed operational work any of the following?

 

 

Specified works in the area

| Yes No

 

 

Operational work that is a necessary and unavoidable part of installing or maintaining works or
infrastructure required to support other development for which a development permit or
compliance permit is not required or, if a development application or a request for compliance
assessment is required, the permit is held or has been applied for.

C] Yes xX No

 

 

 

Checklist 4—Operational work

Version 4.1—1 October 2074

 

Used in these records

About this file

File size
2.0 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

OPW14_0362 Operational Works for reconstruction of stormwater pit.pdf · 2.0 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.