05. Hales - Planning Report
Attached to the e-mail Operational Works Application OPW20/0117 - 37 Mossman Crt Noosa Heads.
PROJECT URBAN – 20153 13 Jul 2020
Performance Criteria Acceptable Solution Comments
the extent it is more stringent than the
standard mentioned paragraph (a);
d) any other relevant planning scheme
standard that is not inconsistent with
the standards mentioned in
paragraphs (a), (b) and (c).
Performance Criteria Acceptable Solution Comments
Earthwork and Vegetation
7.1 Excavation and filling for The earthwork and filling for the prescribed Compliant.
prescribed tidal work:- tidal work is consistent with each relevant
a) is carried out only to the planning scheme standard. Only the minimum excavation
extent reasonably necessary for the wall works
necessary for the work; and placement of the jetty will
and occur. A temporary sediment
b) does not have a control measure will be used
significant adverse and this is shown on the
effect on:- proposed plans.
(i) the natural features,
including the banks,
of the tidal water in
the works’
immediate
surroundings; or
(ii) the level of the
surface of the land
under the tidal
water in the works’
immediate
surroundings or any
foreshore near the
works.
7.2 The location and Vegetation on land affected by the Not applicable.
construction of prescribed prescribed tidal works is dealt with in a way
tidal works ensures consistent with the following standards:- No vegetation will be disturbed
vegetation is cleared or a) subject to paragraph (b), the clearing on the site.
disturbed only to the extent or disturbance of vegetation for a
reasonably necessary for the purpose associated with the
work. construction of prescribed tidal works,
including, for example, parking for
construction or workers’ vehicles or
stockpiling of construction materials –
(i) Is avoided; or
(ii) If the clearing or disturbance of
vegetation for a purpose
associated with the construction of
a works cannot be avoided – the
Development Assessment Report Page 17 of 42
Operational Works
37 Mossman Court, Noosa Heads 4567
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.