Skip to the record
For the highest quality transcripts.

Original source · versioned page text

05. Hales - Planning Report

Attached to the e-mail Operational Works Application OPW20/0117 - 37 Mossman Crt Noosa Heads.

of 43

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

PROJECT URBAN – 20153                                                                                    13 Jul 2020


 Performance Criteria                Acceptable Solution                             Comments
 Earthwork and Vegetation
                                              clearing or disturbance is limited
                                              to the smallest area of land
                                              reasonably necessary for the
                                              purpose;
                                     b) any other relevant planning scheme
                                         standard that is not inconsistent with
                                         paragraph (a).
 7.3 After the construction          Land or vegetation affected by the              Compliant.
 of prescribed tidal works,          prescribed tidal works is dealt with in a way
 any land damaged or                 consistent with the following standards:-       The top of the canal bank will
 destabilized by, and any            a) subject to paragraph (b):-                   be returned to its natural profile
 vegetation         damaged,             i)        land surfaces damaged or          as part of the works.
 destroyed or removed by,                          destabilised by the prescribed
 the construction of the                           tidal works are restored an
 works is rehabilitated.                           stabilised; and
                                         ii)       vegetation           damaged,
                                                   destroyed or removed by
                                                   prescribed tidal works is
                                                   replaced        with     native
                                                   vegetation for the locality
                                                   within which the work is
                                                   located, to the extent it is
                                                   reasonably practicable to
                                                   replace the vegetation with
                                                   native vegetation;
                                     b) if a relevant planning scheme standard
                                         is more stringent than the standard
                                         mentioned in paragraph (a) – the
                                         relevant planning scheme standard, to
                                         the extent it is more stringent than the
                                         standard mentioned paragraph (a);
                                     c) any other relevant planning scheme
                                         standard that is not inconsistent with
                                         the      standards      mentioned      in
                                         paragraphs (a) and (b).

 Performance Criteria                Acceptable Solution                             Comments
 Public access – availability
 8.1 Prescribed tidal works          The design and construction of the              Compliant
 do not have a significant           prescribed tidal work is consistent with:-
 adverse effect on the               a) subject to paragraph (b), prescribed         There is no public access
 availability of public access           tidal works do not involve the erection     permitted along the foreshore
 to, along or across State               or placement of any physical barrier        in this location. The proposed
 coastal land.                           preventing existing public access,          structure does not involve the
                                         along or across State coastal land near     erection of any physical barrier
                                         the works;

Development Assessment Report                                                                             Page 18 of 42
Operational Works
37 Mossman Court, Noosa Heads 4567
Log in to download the original file

05. Hales - Planning Report.pdf · 2.3 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.