05. Hales - Planning Report
Attached to the e-mail Operational Works Application OPW20/0117 - 37 Mossman Crt Noosa Heads.
PROJECT URBAN – 20153 13 Jul 2020
Performance Criteria Acceptable Solution Comments
Infrastructure, including, access, parking, sewerage and water services
11.1 Prescribed tidal work The infrastructure for prescribed tidal work N/A
has appropriate is consistent with each relevant planning
infrastructure, including, in scheme standard. The proposed structure does
particular, road access, not require any additional
parking facilities, sewerage services of this nature.
services and water services,
having regard to the
following:-
a) the nature and scale of
the work; and
b) the number of people
that may be on or at the
work at any time; and
c) the number of vehicles
that may be on or
moored at the work at
any time; and
d) the protection of any
foreshores near the
work and the vegetation
and marine plants on
the foreshores
Performance Criteria Acceptable Solution Comments
Design, construction and safety – all prescribed tidal work
12.1 Prescribed tidal works The design and construction of the Compliant.
are designed and prescribed tidal work is consistent with the
constructed in a way to following standards:- The proposed structure will be
ensure it is structurally a) subject to paragraph (c), each consistent with Australian
sound, having regard to the Australian Standard relevant to the Standards relevant to the
following:- design or construction of structures, to design and construction of the
a) relevant engineering the extent requirements stated in the structure. All requirements will
standards; Standard apply to the design or be addressed in the engineered
b) the location of the work; construction of prescribed tidal works; plans and as contained in the
c) the purpose for which b) subject to paragraph (c), the projected structural certificate.
the work is to be used; sea level rise is factored into the design
d) the impact of flooding, and construction of the prescribed
storm tide, overtopping tidal works;
by waves, projected sea c) if a relevant planning scheme standard
level rise, tidal is more stringent than any standard
influences and mentioned paragraph (a) – the relevant
hydrodynamic forces; planning scheme standard, to the
e) the design life of the extent it is more stringent than the
works; standard mentioned in paragraph (a)
or (b).
Development Assessment Report Page 20 of 42
Operational Works
37 Mossman Court, Noosa Heads 4567
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.