05. Hales - Planning Report

Attached to the e-mail Operational Works Application OPW20/0117 - 37 Mossman Crt Noosa Heads.

of 43

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

PROJECT URBAN – 20153                                                                              13 Jul 2020


 Performance Criteria            Acceptable Solution                            Comments
 Design, construction and safety – all prescribed tidal work
 f) the dead load of the
     works and the intended
     live load for the works;
 g) the        impact         of
     hydrostatic      pressures
     on the works;
 h) the        stability      of
     individual components
     of the works, including
     for example, boulders,
     concrete       blocks    or
     sandbags.
 12.2 Prescribed tidal work The design and construction of the                  Compliant.
 does not adversely affect prescribed tidal work is consistent with the
 the structural integrity of following standards:-                              The proposal includes the
 any existing revetment or a) subject to paragraph (b), prescribed              installation of a new boundary
 seawall or another existing         tidal works, including any shore           wall. The proposed jetty will
 structure.                          abutment, piling or other structure        not attach to the new wall so no
                                     connected with the work:-                  additional loads will be placed
                                     (i) does not place an additional load      on this wall.
                                          on any existing revetment or
                                          seawall or another existing
                                          structure; or
                                     (ii) can be structurally supported by
                                          an existing revetment or seawall or
                                          another existing structure;
                                 b) if a relevant planning scheme standard
                                     is more stringent than the standard
                                     mentioned in paragraph (a) – the
                                     relevant planning scheme standard, to
                                     the extent it is more stringent than the
                                     standard mentioned in paragraph (a).
 12.3 Prescribed tidal work The design and construction of the                  Compliant.
 are       designed          and prescribed tidal works is consistent with
 constructed in a way to the following standards:-                              The proposed works will
 ensure it does not adversely a) subject to paragraph (b), prescribed           involve       only      minimal
 affect the stability of the bed     tidal work does not cause, by changing     disturbance to the canal bed
 and banks of any tidal water.       the flow of water, the removal of, or      and banks during the works.
                                     disturbance to, the sediment on the        Temporary sediment control
                                     bed and banks of any tidal water;          measures will be input in place
                                 b) if a relevant planning scheme standard      as per the proposed plans. The
                                     is more stringent than the standard        effects will be relatively short
                                     mentioned in paragraph (a) – the           term. This is certified in the
                                     relevant planning scheme standard, to      engineer’s certificate.
                                     the extent it is more stringent than the
                                     standard mentioned in paragraph (a).

Development Assessment Report                                                                       Page 21 of 42
Operational Works
37 Mossman Court, Noosa Heads 4567
Log in to download the original file

05. Hales - Planning Report.pdf · 2.3 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.