05. Hales - Planning Report
Attached to the e-mail Operational Works Application OPW20/0117 - 37 Mossman Crt Noosa Heads.
PROJECT URBAN – 20153 13 Jul 2020
Performance Criteria Acceptable Solution Comments
Design, construction and safety – all prescribed tidal work
12.4 Prescribed tidal works The design and construction of the Compliant.
are designed and prescribed tidal works is consistent with
constructed using materials the following standards:- The proposed structure will be
suitable for marine a) subject to paragraph (b), each constructed utilizing materials
environments, having Australian Standard relevant to the that have a long life and are
regard to their ability to materials that should be used, or the resilient to marine organisms,
resist the following:- measures that should be taken to treat corrosion and saltwater. The
a) attack by marine materials used, for structures, to the engineered plans show the
organisms; extend the requirements stated in the materials used.
b) corrosion; Standard apply to structures located in
c) deterioration or a marine environment;
breakage resulting from b) if a relevant planning scheme standard
exposure to is more stringent than the standard
environmental mentioned in paragraph (a) – the
conditions including, for relevant planning scheme standard, to
example, the following:- the extent it is more stringent than the
(i) abrasion; standard mentioned in paragraph (a).
(ii) immersion
in seawater;
(iii) wave
action.
12.5 Prescribed tidal works The design and construction of the Not applicable.
are designed and prescribed tidal works is consistent with
constructed in a way to the following standards:- There are no stormwater
ensure they do not a) subject to paragraph (c), vessels outlets near the proposal.
adversely affect the moored at prescribed tidal work do not
operation or maintenance impede the discharge of stormwater;
of any existing stormwater b) subject to paragraph (c), prescribed
outlet. tidal work does not restrict access to
any stormwater outlet;
c) if a relevant planning scheme standard
is more stringent than the standard
mentioned in paragraph (a) – the
relevant planning scheme standard, to
the extent it is more stringent than the
standard mentioned in paragraph (a)
or (b).
12.6 Prescribed tidal works The design and construction of the Compliant.
are designed and prescribed tidal works is consistent with
constructed in a way to the following standards:- The proposed structure will
ensure they do not a) subject to paragraph (b), each involve only minimal and short
adversely affect the water Australian Standard relevant to the term disturbance to the canal
quality of any tidal water, design or construction of structures bed during the works. There
including, in particular, as a under, within or over tidal water, to the will be temporary sediment
result of:- extent the requirements stated in the control measures put in place
a) release, into the tidal Standard are directed at maintaining to keep disturbance
water, of materials used the water quality of tidal water; minimalized for the duration of
Development Assessment Report Page 22 of 42
Operational Works
37 Mossman Court, Noosa Heads 4567
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.