Original source · versioned page text
Civil Engineering Report
Original PDF page 67, section 1. The text section number identifies this passage in the reader.
EARTHWORKS CODE Performance Criteria and Acceptable Solution 23 Bottlebrush Avenue, Noosa Head. 22 May 2025 PERFORMANCE OUTCOMES ACCEPTABLE OUTCOMES RESPONSE AO4.2 Earthworks are undertaken only during the hours of 7am to 6pm, Monday to Friday and 7am to 6pm on Saturday. No work is undertaken on Sunday or public holidays. Vegetative Waste PO5 AO5.1 RO5 Vegetation cleared from a development site is Cleared vegetation is transported off-site for Development will comply with the requirements disposed of in an environmentally responsible disposal in an approved green waste disposal of the Acceptable Outcome with regards to manner. facility; vegetation clearing. OR AO5.2 Cleared vegetation is mulched on-site and reused for landscaping of the finished development; OR AO5.3 Cleared vegetation is disposed of for the purpose of firewood. (Note: Disposal of vegetative waste by burning off is not an acceptable method of disposal). https://mpncnetau.sharepoint.com/sites/administration/shared documents/10000-10999/10300-10399/10306/codes/22-05-25 earthworks code_issue a.docx Page 3
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (Civil Engineering Report.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.