Skip to the record
Accept no substitutions.

Original source · versioned page text

Civil Engineering Report

of 76

Page text read automatically using OCR, there may be inaccuracies

Original PDF page 67, section 1. The text section number identifies this passage in the reader.

EARTHWORKS CODE
Performance Criteria and Acceptable Solution
23 Bottlebrush Avenue, Noosa Head.
22 May 2025
             PERFORMANCE OUTCOMES                                               ACCEPTABLE OUTCOMES                                                  RESPONSE
                                                                  AO4.2
                                                                  Earthworks are undertaken only during the
                                                                  hours of 7am to 6pm, Monday to Friday and
                                                                  7am to 6pm on Saturday. No work is
                                                                  undertaken on Sunday or public holidays.

Vegetative Waste

PO5                                                               AO5.1                                                             RO5
Vegetation cleared from a development site is                     Cleared vegetation is transported off-site for                    Development will comply with the requirements
disposed of in an environmentally responsible                     disposal in an approved green waste disposal                      of the Acceptable Outcome with regards to
manner.                                                           facility;                                                         vegetation clearing.
                                                                  OR

                                                                  AO5.2
                                                                  Cleared vegetation is mulched on-site and
                                                                  reused for landscaping of the finished
                                                                  development;
                                                                  OR

                                                                  AO5.3
                                                                  Cleared vegetation is disposed of for the
                                                                  purpose of firewood.
                                                                  (Note: Disposal of vegetative waste by burning
                                                                  off is not an acceptable method of disposal).




https://mpncnetau.sharepoint.com/sites/administration/shared documents/10000-10999/10300-10399/10306/codes/22-05-25 earthworks code_issue a.docx
                                                                                             Page 3

Log in to download the original (Civil Engineering Report.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.